Prism Mount for Mirror 2 

(Looking from back of laser with lid off and cover removed)

Screw 1 Up and Down
Pivot Screw - do not adjust
Screw 2 Left and Right

Prism Mount

Screw 1

Screw 2

Pivot Screw

Mirror

Once mirror 2 is adjusted we will now repeat all the steps to check and adjust P3 to P4.

 Do not forget

to remove tape from back of mirror 3.

 Place your tape over the lens carriage opening. 

(The hole on left side of lens carriage.)
As before P3 burn position will not move. Your goal is to get the dot from P4’s firing to line up on top
of P3’s. The difference here is P4 is so far away the beam gets quite large. The burn mark will take
longer to form and the dot is much larger. 

Burn in P4 1st to make visibility easier.

  Adjust the prism 

mount of mirror 3 using the offset screw driver. Follow the same process as used on mirror 2.
Repeat until P3 falls on top of P4.

You are almost done.

Once you have adjusted the prism mount run the P2 burn again. If it lands on top of your original
P1 burn your done. If not re-adjust to correct. You may wish to use a new piece of tape and run P1
and P2 again. Repeat as often as necessary until P2 line up directly on top of P1

Lock Screw

Lock Screw

Lock Screws must be tightened when adjustments completed. Adjustments should 
be made with lock screws snug, they may need to be loosened slightly if adjustment 
is made on screws 1 or 2 in a clockwise direction. (Please note tightening up Lock 
Screws may affect beam alignment adjust alignment as necessary)

Remember to always wear safety glasses while doing any open beam tests.

Содержание Mercury

Страница 1: ...Mercury Beam Alignment Remember to always wear safety glasses while doing any open beam tests Copyright Koser Enterprises Inc 2006 Member of the LaserProNA com group Rev 1 00002...

Страница 2: ...le at the bottom of the lens assembly If beam adjustment is necessary it may be easier to remove the lid for better access to the optics and to see what your doing The first step is to check your mach...

Страница 3: ...your beam alignment Position the X axis in PI figure 1 The X axis should be pushed all the way back Close the Lid Pull the x axis arm toward you und look at the back There should be a small brown blac...

Страница 4: ...ne with mirror 2 Please go to next page If not continue with this page Blue If your dots look something like this you need to adjust mirror 2 Please note your Red Dot will NOT line up with your burn m...

Страница 5: ...t hardware stores Disconnect 3 wire clips 1 Black and Orange 2 Black and Red On older models the Black and Red wires will be in the back right The B R are the lids interlocks The B O is the Door Open...

Страница 6: ...so that the Ribbon Cable can be plugged back in It is keyed and can only be plugged in one way Make sure the lid is propped so it will not slide Place two of the lid screws as shown above in booth of...

Страница 7: ...as described in blue text on page 2 If your results are not similar to the above you will need to adjust mirror 2 so that only 1 burn mark and the red dot are visible on the test tape 4 The red beam w...

Страница 8: ...n in P4 1st to make visibility easier Adjust the prism mount of mirror 3 using the offset screw driver Follow the same process as used on mirror 2 Repeat until P3 falls on top of P4 You are almost don...

Страница 9: ...ou may be hitting the air nozzle and not getting full power You will need to adjust mirror 1 to move the beam away from the edge Once completed re check P1 P4 once more Any adjustments at this point s...

Страница 10: ...r 0 Mirror 1 Next remove the small vent plate on the left side bottom of the machine Figure 7 and remove the two thumb screws and the black mirror cover figure 8 Remember to always wear safety glasses...

Страница 11: ...ear of machine Front of machine Screw 2 Clockwise Counter Clockwise Lock Screws must be tightened when adjustments completed Adjustments should be made with lock screws snug they may need to be loosen...

Страница 12: ...the job 9 Measure your results The left and top edge of the rectangle should be 5 from the material edge 10 If not repeat step 1 9 However this time rather the watching the Red Diode add or subtract...

Страница 13: ......

Отзывы: