SETTING UP
Virtually every project is different in terms of jobsite fabrication of the platform that the Quad
1000HDD mounting trivet will be mounted to.
There is one constant however, and that is that the platform must be flat, level and rigid.
Once the platform is positioned and welded in place, the Quad 1000HDD can be precisely positioned on the platform.
One method would be to attach the Quad 1000HDD to the rotational mount on the trivet mount, attach a survey-prism to
the 5/8 thread on the top of the Quad 1000HDD. Level the bulls-eye bubble using the three leveling screws and traverse
the Quad 1000HDD across the platform using a total station to position the unit to the plumb point.
Once the Quad 1000HDD is directly over (or under) your plumb point with the bulls-eye level, then tie the trivet down
using the tie down anchor slots.
What Happens When You Power Up?
The Quad 1000HDD is activated and controlled by a single button. When you push the power button, the
unit begins to self-level and the downward shooting beam will blink.
Once the Quad 1000HDD has self-leveled to within its operating spec, the beam then becomes steady.
*Note:
Self leveling time is normally under 10 seconds.
Содержание QUAD 1000HDD
Страница 11: ...NOTES...