Page 3 of 4
POWER SWITCH
BREAKERS
SOLAR CONTROLS
The job box consists of all the solar controls and electronics.
The following switches should be turned ON for proper function.
Yellow Breaker ON
– Solar Controller cutoff switch. Enables battery charging.
Black Toggle Switch ON
and Breakers ON
– Enables power to all electronics separate from
the solar controller and solar panels.
ENABLING SOLAR CHARGING
Turn all switches ON to enable the solar charger
and power supply.
1.
Breaker ON
2.
Power Switch ON
Once these switches are turned ON, the
controller display will turn on indicating the unit is
active. Clean and adjust the solar panels
towards the sun to receive the best possible
charge throughout the day.
Turn on the Power Switch
Make sure the inverter is switched ON.
The main power switch controls everything
connected to the terminal blocks.
THERMOSTAT
Adjusted from factory to keep the unit cool in warm temperatures. The thermostat will automatically
enable a fan when temperatures exceed the set point and turn off once cooled.
REMOVING THE HITCH
The trailer hitch can be removed preventing the trailer from unauthorized towing. Remove the two
bolts
❶
&
❷
from the graphic below
holding it in place and lift the hitch off. This can be stored
inside the job box when not in use. To install the hitch, place it back on the trailer tongue and replace
the two bolts. Be sure both safety chains are attached.
80A BREAKER