Page 2 of 4
SPG530-500AH-24V-4X120V-TLR10
SERIES OPERATION
MANUAL
DEPLOYING THE UNIT
1.
Choose a location that is close to level as possible to position the trailer. Drop the trailer
from the tow vehicle using the single hand jack located on the front of the trailer. Ensure
that the safety chains, trailer cable, and breakaway lanyard have been disconnected from
the tow vehicle.
2.
Once the trailer has been disconnected from the hitch of the tow
vehicle, extend the remaining jacks. There are (2) leveling jacks
located on the back and (2) jacks located on the front of the
trailer. Pull the pin on the side of the jack to rotate it 90
°
toward
the ground and hand crank the jack clockwise to extend it.
Models with light mast, use a bubble level to ensure the
mast is level before extending!
3.
To position the solar panels 45°, there is a pin located on each
side of the solar panel. Remove each pin to free the panel
assembly and pivot the solar panels down against the frame at a
45° angle. Insert each pin to secure the panels in the new
position.
4.
Unlatch the solar panel and reposition it 45°. There is a hand
screw located on each side of the solar panel. With help, remove
each hand screw to free the panels and pivot the solar panels
down against the frame at a 45° angle. Insert each hand screw
to secure the panels.
5.
Open the job box located on back of trailer. If included with a
padlock, locate the keys to both padlocks if it is locked. The job
box will open once unlocked and there is no need to remove the
padlocks.
6.
See Solar Controls section. Move the power switch to its
ON
position to power the internals. Make sure all breakers and
switches are moved to the
ON
position at this time. This will
enable power to your attached devices and allow the solar
panels to begin charging the batteries. A built in cooling system
will circulate air when the job box exceeds 90° F (32° C) to help
keep the internals cool.