SPG366A-600 Series
Larson Electronics, LLC
Phone: (800) 369-6671
Fax: (903) 498-3364
www.larsonelectronics.com
4 of 6
1.)
Unlock the compartment door at the
front
of the
trailer to access the internal controls.
2.)
Turn
the battery disconnect switch (C) to the
on position
.
Flip the black and yellow solar charger
breaker (A) and the black solar panel breaker (B) to
the on positions.
3.)
DO NOT RAISE MAST YET.
When you turn on
the system, the remote meter will display
"SEARCHING...", DO NOT raise the mast until this is no
longer displayed.
4.)
When the system is ready, you can now raise the
mast. To raise, flip the air compressor switch to
COMPRESSOR ON and the mast switch to MAST UP
and allow the mast to fully elevate.
NOTE: The T-Head
mast supports up to 120 lbs. DO NOT overload.
5.)
Once the mast is full, the air compressor will
automatically shut off. This typically
takes 30 seconds to
1 minute after the mast has fully extended. Keeping the
air
compressor switched on will keep the mast elevated
during long term deployment.