
Mounting and installation
9
Inspection Light LED
ATEX-EHL-1123-LED
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
7.2
Mounting / dismounting, operating position
7.2.1 Wire Guard Assembly
7.2.2 Wall mounting
7.3
Installation
7.3.1 Electrical connections
• Installation of the plugs should be performed in accordance with the corresponding
operating instructions.
05337E00
• remove the suspension hook (4) from
the enclosure tube (2).
• push the wire guard (3) over the
enclosure tube.
• push the first coil of the wire guard
over the lip of the grip (1)
• push the suspension hook back onto
the enclosure tube and push the last
coil of the wire guard over the lip of
the suspension hook when doing so.
• wire guard is now fitted.
05342E00
• fix the mounting brackets to the
wall at a spacing distance of
360 mm.
• clip the inspection light into the
mounting brackets.
• wall mounting is complete.
WARNING
Danger due to wrong plugs!
The explosion protection is impaired!
• Only use plugs, which are approved for use in the relevant zone.
The light is delivered with a connection cable. A standard CE connector must
be used for operation. When selecting the connector observe the IP level of
protection!
All versions can be operated with a cable length of up to 100 m.
It is not permitted to extend the connection cable.
1
2
3
4
360 mm / 14,17 "
Larson Electronics, LLC.
(800) 369-6671 | [email protected]
www.LarsonElectronics.com