Lantronix PremierWave Enterprise Wi-Fi 2050 Скачать руководство пользователя страница 9

2: Evaluation Kit 

PremierWave® 2050 Enterprise Wi-Fi® IoT Module Evaluation Kit User Guide 

Ref Des. 

Connector/Header Function 

J7 

Serial Port 2  
Standard DB9 port for connection to RS232, RS485, and RS422 networks 

J8 

Dual Type A USB Host Port 
Port A of jack is a USB2.0 full speed port 
Port B of jack is a USB2.0 high speed port  

J9 

Mini USB Connector 
Standard USB device port that can be used to power the evaluation board and/or drive  the 

PremierWave 2050 module USB 2.0 High Speed device port.  

J10 

Mini USB Connector 
Standard USB device port that can be used to power the evaluation board and/or drive  the 

evaluation board USB-to-serial converter.  The USB serial port converter is connected to the 

module serial debug port 

J11 

Ethernet Jack 
RJ45 jack for connection to the module Ethernet port 

JP1 

Module Power Jumper 
Allows for power measurement of the PremierWave 2050 module.  Remove L1 and install 

current sensor in line with JP1 for module current measurements 

JP2 

Configurable Pin Header 
Header with 3.3V power, ground, C1, CP2, CP3, CP4, CP7, CP8.  Useful for connecting to 

SPI devices. 

JP3 

Not installed - reserved for future use 

JP4 

HW Reset Button Jumper 
Allows access to module HW reset signal and SW1 push button.  Install to use SW1 as  HW 

reset button. 

JP5 

Default Button Jumper 
Allows access to module reset to default signal and SW2 push button. Install to use SW2 as 

reset to default button. 

JP6 

WAKE Header 
Allows access to module WAKE signal and SW3 push button.  Install to use SW3 to wake up 

the PremierWave 2050 module when in low power modes. 

JP7 

SDIO Card WP Header 
Reserved for future use with SDIO compatible modules 

JP8 

SDIO Card Detect Header 
Reserved for future use with SDIO compatible modules 

JP9 

Serial Port 1 Breakout Header 
Install jumpers to connect PremierWave 2050 Serial Port 1 flow control signals to the 

RS232/RS422/RS485 transceiver for Serial Port 1. 

JP10 

Serial Port 1 RS232/RS422/RS485 Mode Jumper 
Leave open for RS232 mode.  Install for RS422/RS485 

JP11 

Serial Port 1 RS422/RS485 Mode Jumper 
Leave open for RS232 or 4-wire mode.  Install for 2-wire mode. 

JP12 

Serial Port 2 Breakout Header 
Install jumpers to connect PremierWave 2050 Serial Port 2 flow control signals to the 

RS232/RS422/RS485 transceiver for Serial Port 2. 

Содержание PremierWave Enterprise Wi-Fi 2050

Страница 1: ...Part Number 900 765 R Revision A February 2016 PremierWave 2050 Enterprise Wi Fi IoT Module Evaluation Kit User Guide ...

Страница 2: ...om about contact Disclaimer and Revisions All information contained herein is provided AS IS Lantronix undertakes no obligation to update the information in this publication Lantronix does not make and specifically disclaims all warranties of any kind express implied or otherwise regarding title non infringement fitness quality accuracy completeness usefulness suitability or performance of the inf...

Страница 3: ...y Lantronix will void the user s authority to operate this device The information in this guide may change without notice The manufacturer assumes no responsibility for any errors that may appear in this guide Refer to the module datasheet for full compliance information Revision History Date Rev Comments February 2016 A Initial document ...

Страница 4: ..._______________________ 6 Additional Documentation ____________________________________________________ 6 2 Evaluation Kit 7 PremierWave 2050 Evaluation Kit Contents ______________________________________ 7 Evaluation Board Description _________________________________________________ 7 Serial Ports 1 and 2 RS232 RS485 RS422 Connections ___________________________ 10 Serial Debug Port ____________...

Страница 5: ...S 232 Signals on J6 and J7 Serial Ports______________________________ 10 Table 2 3 RS 422 4 Wire Signals on J6 and J7 Serial Ports ________________________ 11 Table 2 4 RS 485 2 Wire Signals on J6 and J7 Serial Ports ________________________ 11 Table 2 5 JP10 JP11 JP13 and JP14 Jumper Settings for Serial Ports ______________ 11 Table 2 6 JP9 Serial Port 1 Flow Control Break Out Header_____________...

Страница 6: ...onal documentation Document Description PremierWave 2050 Enterprise Wi Fi IoT Module User Guide Provides information needed to configure use and build applications on the PremierWave 2050 PremierWave 2050 Enterprise Wi Fi IoT Module Command Reference Provides a list and description of PremierWave 2050 module commands PremierWave 2050 Enterprise Wi Fi IoT Module Evaluation Kit Quick Start Guide Ins...

Страница 7: ...uation board uses either a 5V power from a USB device port connector or a power supplied to the Ethernet connector via Power Over Ethernet PoE The evaluation kit includes a 5V wall adapter with a USB plug to allow powering the evaluation board from a standard power strip The evaluation board includes all the necessary regulators to power the PremierWave 2050 module and contains the following featu...

Страница 8: ...on Board eaderFunction pin expansion c h 3 3V power g an off board I2C e JTAG debug be cable Header uture testing d Slot uture use with nnector nal 5V power s port for conne dule Evaluatio e 2050 evalu The following t Further desc ation Board P d Connectors n connector ground and sig C device over ger Connect t SDIO compatib supply ction to RS232 on Kit User Gu ation board a table lists eac cripti...

Страница 9: ...C1 CP2 CP3 CP4 CP7 CP8 Useful for connecting to SPI devices JP3 Not installed reserved for future use JP4 HW Reset Button Jumper Allows access to module HW reset signal and SW1 push button Install to use SW1 as HW reset button JP5 Default Button Jumper Allows access to module reset to default signal and SW2 push button Install to use SW2 as reset to default button JP6 WAKE Header Allows access to ...

Страница 10: ...et to reboot the module SW2 Module Reset to Default When pushed asserts the PremierWave 2050 module reset to default function SW3 WAKE Button When pushed asserts the PremierWave 2050 module WAKE signal Functional for PremierWave 2050 module only Serial Ports 1 and 2 RS232 RS485 RS422 Connections The evaluation board has two multiprotocol RS 232 RS422 RS485 ports for connection to the PremierWave 2...

Страница 11: ...232 RS422 4 wire or RS485 2 wire by jumper settings on JP10 JP11 JP13 and JP14 The table below lists the correct jumper installation for each mode Table 2 5 JP10 JP11 JP13 and JP14 Jumper Settings for Serial Ports Serial Port 1 Mode J6 JP10 JP11 Serial Port 2 Mode J7 JP13 JP14 RS232 Default OUT OUT RS485 2 wire IN IN RS422 4 wire IN OUT All of the PremierWave 2050 serial port signals can be used a...

Страница 12: ...TX output 2 1 RS232 RS485 TX 78 Serial port RX input 4 3 RS232 RS485 RX 24 Serial port RTS2 or TX enable or configurable pin 6 5 RS232 RTS RS485 TX Enable 26 Configurable pin CP9 or Serial port DTR2 8 7 RS232 DTR 25 Serial port CTS2 or configurable pin 10 9 RS232 CTS 60 Configurable pin CP10 or Serial port DCD2 12 11 RS232 DCD Serial Debug Port In order to access the unit through the J10 USB port ...

Страница 13: ... PremierWave 2050 module 10 100Mbps Ethernet interface Connector J11 is the Ethernet port Power Supply The evaluation board provides three options for input power Included with the kit is a 5V wall adapter that plugs into J5 In addition to powering from the wall adapter the evaluation board can also be powered from a standard PC USB host port by connecting a USB cable between the PC and either J9 ...

Страница 14: ...ofile Error LED flashes long long long short short 2 seconds off continuous pattern WPS Timeout Error LED flashes long long long short short short short 2 seconds off continuous pattern 56 J11 pin 17 Yellow Ethernet Speed 100 Mbps Mode LED is ON 72 J11 pin 19 Green Ethernet Link Activity LED is ON when there is an Ethernet link and blinks when there is Ethernet activity Additional Headers The tabl...

Страница 15: ...P1 configurable pin External SPI Device Reset JP2 pin 8 Ground Test point J1 pin 1 Board 3 3V power J1 pin 2 Board 3 3V power 71 J1 pin 3 CP1 configurable pin External I2C Device Reset 17 J1 pin 4 CP6 configurable pin External I2C Device Clock 16 J1 pin 5 CP5 configurable pin External I2C Device Data IO 57 J1 pin 6 CP13 configurable pin External I2C Device Interrupt J1 pin 7 Ground J1 pin 8 Ground...

Страница 16: ...2 Evaluation Kit PremierWave 2050 Enterprise Wi Fi IoT Module Evaluation Kit User Guide 16 Evaluation Board Schematic Figure 2 2 Evaluation Board Schematic for Part 1 of 4 ...

Страница 17: ...2 Evaluation Kit PremierWave 2050 Enterprise Wi Fi IoT Module Evaluation Kit User Guide 17 Figure 2 3 Evaluation Board Schematic Part 2 of 4 ...

Страница 18: ...2 Evaluation Kit PremierWave 2050 Enterprise Wi Fi IoT Module Evaluation Kit User Guide 18 Figure 2 4 Evaluation Board Schematic Part 3 of 4 ...

Страница 19: ...2 Evaluation Kit PremierWave 2050 Enterprise Wi Fi IoT Module Evaluation Kit User Guide 19 Figure 2 5 Evaluation Board Schematic Part 4 of 4 ...

Страница 20: ...Mouser Electronics Authorized Distributor Click to View Pricing Inventory Delivery Lifecycle Information Lantronix PW205010002K PW205020002K ...

Отзывы: