16
STEP 10
Motor commissioning.
The motor must now be commissioned. Standard motor setup instructions
will be included with the delivery. Alternatively instructions can also be found
at the bottom of the page on
the link below.
https://www.skylight-blinds-direct.co.uk/skylight-roof-lantern-blinds-
Mains powered motors must be connected to an RCD protected circuit.
Once the commissioning has been done, clip the front cover into place and
secure it with a screw at each end.
Your installation is now complete
Содержание KuroLok RL
Страница 1: ...FITTING INSTRUCTIONS 1...