background image

 

9

 

Powerful 

water jets 

Water projected in powerful 

jets (12.5 mm nozzle) 

against the enclosure from 

any direction shall have no 

harmful effects. 

Test duration: at least 

3 minutes 

Water volume: 100 litres per 

minute 

Pressure: 100 kPa at 

distance of 3 m 

Immersion 

up to 1 m 

Ingress of water in harmful 

quantity shall not be 

possible when the 

enclosure is immersed in 

water under defined 

conditions of pressure and 

time (up to 1 m of 

submersion). 

Test duration: 30 minutes 

Immersion at depth of at 

least 1 m measured at 

bottom of device, and at least 

15 cm measured at top of 

device 

Immersion 

beyond 1 m 

The equipment is suitable 

for continuous immersion in 

water under conditions 

which shall be specified by 

the manufacturer. 

Normally, this will mean 

that the equipment is 

hermetically sealed. 

However, with certain types 

of equipment, it can mean 

that water can enter but 

only in such a manner that 

it produces no harmful 

effects. 

Test duration: continuous 

immersion in water 

Depth specified by 

manufacturer 

Powerful 

high 

temperature 

water jets 

Protected against close-

range high pressure, high 

temperature spray downs. 

— 

 

Содержание TPGS-L6216XT

Страница 1: ...r Manual Hardware TPGS L6216XT 16 10 100 1000T 2 10G Copper w 10 or 16 PoE at af EN50155 OS3 Managed Ethernet Switch TGS L6216XT 16 10 100 1000T 2 10G Copper EN50155 OS3 Managed Ethernet Switch May 20...

Страница 2: ...an STP network cable in demanding electrical environments Examples of demanding indoor environments are where the network cable is located in parallel with electrical mains supply cables or where larg...

Страница 3: ...ent of Lantech Communications Global Inc Products offered may contain software which is proprietary to Lantech Communications Global Inc The offer or supply of these products and services does not inc...

Страница 4: ...occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encourage...

Страница 5: ...3 2 1 Wall mount installation 13 Chapter 3 Connect Cable 15 3 1 Power input M12 connector 15 3 2 Console USB dongle M12 connector 16 3 3 10 100 1000T interface M12 connector 18 3 4 10G interface M12 c...

Страница 6: ...10 100 1000T with up to 16 PoE at af injectors by M12 connectors which provides L2 wire speed and advanced security function for connecting PD network In this paragraph it will describe the Industria...

Страница 7: ...6 1 2 Package Content Product Console cable...

Страница 8: ...t access to hazardous parts e g electrical conductors moving parts and the ingress of solid foreign objects Level Object size protected against Effective against 0 No protection against contact and in...

Страница 9: ...o 15 from its normal position Test duration 10 minutes Water equivalent to 3 mm rainfall per minute 3 Spraying water Water falling as a spray at any angle up to 60 from the vertical shall have no harm...

Страница 10: ...0 minutes Immersion at depth of at least 1 m measured at bottom of device and at least 15 cm measured at top of device 8 Immersion beyond 1 m The equipment is suitable for continuous immersion in wate...

Страница 11: ...er 1 is active Off Power 1 is inactive PWR2 Green On Power 2 is active Off Power 2 is inactive FAULT Red On Power or port failure Off No failure P1 P16 Link Act Green On A network device is detected B...

Страница 12: ...bypass module will be active because CPU has no ability to ask bypass module keep in open status then bypass will be restored to default position close There is another condition will trigger bypass...

Страница 13: ...12...

Страница 14: ...ll switch in the field 2 1 Wall mount installation 1 Please make sure the screw diameter is M4 2 Check all 4 fix holes on the switch and find corresponding position in the wall Use the appropriate too...

Страница 15: ...14 3 Mount switch in wall with 4 fixed screws 4 Attach switch in wall with 4 screws 5 Move down 6 Tighten 4 screws...

Страница 16: ...dard make sure the connector for the 10G cable also supports this standard or it will reduce the Max throughput of the 10G copper interface 3 1 Power input M12 connector Spec of power input Voltage of...

Страница 17: ...16 Plug power connector and screw in clockwise direction to fix it 3 2 Console USB dongle M12 connector...

Страница 18: ...17 Ping assignment of console USB dongle Make sure the connector is the right direction before you connect it Plug console connector and screw in clockwise direction to fix it...

Страница 19: ...0 100 1000T interface M12 connector Ping assignment of the 10 100 1000T port Make sure the direction of connector is correct before you connect it Plug 10G connector and screw in clockwise direction t...

Страница 20: ...19 3 4 10G interface M12 connector Ping assignment of the 10G port Make sure the direction of connector is correct before you connect it...

Страница 21: ...20 Plug 10G connector and screw in clockwise direction to fix it 3 6 Ground interface M6 connector...

Страница 22: ...d correctly 2 Keep the anti dust cap on all un used switch interface 3 Access switch via web browser and check the below points 3 1 Compare the physical connection of the switch port with the switch i...

Страница 23: ...console port of the switch The connected terminal or PC must support the terminal emulation program 6 2 Login in to the Console Interface When the connection between Switch and PC is ready turn on the...

Страница 24: ...mpt appear Key in admin default value for both User name and Password use Enter key to switch then press Enter and the Main Menu of console management should appear Please see below figure for login s...

Отзывы: