17
Hardware Installation
In this paragraph, we will describe how to install the 8 10/100TX + 2 10/100/1000T/Dual
Speed SFP Combo Industrial Switch and the installation points to be attended to it.
Installation Steps
1. Unpack the Industrial switch packing.
2. Check if the DIN-Rail is screwed on the Industrial switch or not. If the DIN-Rail is not
screwed on the Industrial switch, please refer to
DIN-Rail Mounting
section for DIN-
Rail installation. If the user wants to wall mount the Industrial switch, then please
refer to
Wall Mount Plate Mounting
section for wall mount plate installation.
3. To hang the Industrial switch on the DIN-Rail track or wall, please refer to the
Mounting Installation
section.
4. Power on the Industrial switch. Please refer to the
Wiring the Power Inputs
section
for knowing the information about how to wire the power. The power LED on the
Industrial switch will light up. Please refer to the
LED Indicators
section for indication
of LED lights.
5. Prepare the twisted-pair, straight through Category 5/above cable for Ethernet
connection.
6. Insert one end of UTP/STP cable into the Industrial switch RJ-45 port and the other
end to the network device
’s RJ-45 port, e.g. Switch PC or Server. The RJ-45 port
LED on the Industrial switch will light up when the cable is connected with the
network device. Please refer to the
LED Indicators
section for LED light indication.
7. When all connections are set and LED lights all show in normal, the installation is
complete.