"Маршрутизатор Lantech IES-0208CA - надежный и мощный сетевой устройство для вашей домашней сети. Скачайте бесплатно пользовательское руководство с нашего сайта, чтобы настроить его по вашим потребностям. Посещайте manualshive.com для загрузки."
15
1. First, insert the top of DIN-Rail into the track.
2. Then, lightly push the DIN-Rail into the track.
3. Check if the DIN-Rail is tightened on the track or not.
4. To remove the industrial switch from the track, reverse steps above.
Страница 1: ...Lantech IES 0208CA 8 10 100TX 2 10 100 1000T DUAL Speed Combo Industrial Switch User Manual v1 00 APR 2014...
Страница 2: ...occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encourage...
Страница 3: ...nel 3 Top View 4 LED Indicators 5 Ports 6 Cabling 8 Wiring the Power Inputs 12 Wiring the Fault Alarm Contact 13 Mounting Installation 14 DIN Rail Mounting 14 Wall Mount Plate Mounting 16 Hardware Ins...
Страница 4: ...mance RJ 45 ports support Auto MDI MDI X Function SFP mini GBIC supports 100 1000 Dual Mode Store and Forward Switching Architecture Back plane Switching Fabric 5 6Gbps 1Mbits Packet Buffer 8K MAC Add...
Страница 5: ...10 100 1000T Dual Speed SFP Combo Industrial Switch Pluggable Terminal Block User manual 2 wall mount plates with screws One DIN Rail attached on the switch Compare the contents of the industrial swi...
Страница 6: ...port cabling information and wiring installation Physical Dimension 8 10 100TX 2 10 100 1000T Dual Speed SFP Combo Industrial Switch dimension W x D x H is 72mm x 105mm x 152mm Front Panel The front...
Страница 7: ...l of the industrial switch Top View The top panel of the 8 10 100TX 2 10 100 1000T Dual Speed SFP Combo Industrial Switch has one terminal block connector of two DC power inputs Top Panel of the indus...
Страница 8: ...1 Green Power 1 is active Off Power 1 is inactive PWR2 Green Power 2 is active Off Power 2 is inactive Fault Red PWR1 PWR2 is inactive Off PWR1 PWR2 are both active or no power inputs P1 P8 Green Uppe...
Страница 9: ...connected to network Blinking Networking is active Off Not connected to network Ports RJ 45 ports The UTP STP ports will auto sense for 10Base T 100Base TX connections Fast Ethernet or 10Base T 100Bas...
Страница 10: ...to pins 1 2 3 and 6 at the other end of the cable The table below shows the MDI and MDI X port pin outs Pin MDI X Signal Name MDI Signal Name 1 Receive Data plus RD Transmit Data plus TD 2 Receive Da...
Страница 11: ...the accompanying copper port will link down If you insert the 100M SFP transceiver into the SFP module even without a fiber connection to the remote the connection of the accompanying copper port will...
Страница 12: ...bottom of the module Figure 2 8 Transceiver to the SFP module Make sure the module is aligned correctly and then slide the module into the SFP slot until a click is heard Figure 2 9 Transceiver Insert...
Страница 13: ...sceiver Figure 2 10 LC connector to the transceiver To remove the LC connector from the transceiver please follow the steps shown below First press the upper side of the LC connector from the transcei...
Страница 14: ...11 Second push down the metal loop and pull the transceiver out by the plastic part Figure 2 12 Pull out from the SFP module...
Страница 15: ...Please follow the steps below to insert the power wire 1 Insert the positive and negative wires into the V and V contacts on the terminal block connector 2 To tighten the wire clamp screws for preven...
Страница 16: ...the picture shows below Inserting the wires it will detect the fault status which the power is failure or port link failure for managed model and form an open circuit Note The wire gauge for the term...
Страница 17: ...e DIN Rail is screwed on the industrial switch when out of factory If the DIN Rail is not screwed on the industrial switch please see the following pictures to screw the DIN Rail on the switch Follow...
Страница 18: ...sert the top of DIN Rail into the track 2 Then lightly push the DIN Rail into the track 3 Check if the DIN Rail is tightened on the track or not 4 To remove the industrial switch from the track revers...
Страница 19: ...witch loose the screws to remove the DIN Rail 2 Place the wall mount plate on the rear panel of the industrial switch 3 Use the screws to screw the wall mount plate on the industrial switch 4 Use the...
Страница 20: ...k or wall please refer to the Mounting Installation section 4 Power on the Industrial switch Please refer to the Wiring the Power Inputs section for knowing the information about how to wire the power...
Страница 21: ...ork Application This chapter provides some sample applications to help user to have more actual idea of industrial switch function application A sample application of the industrial switch is shown as...
Страница 22: ...pair connection does not exceed 100 meters 328 feet Diagnosing LED Indicators To assist in identifying problems the switch can be easily monitored through panel indicators which describe common probl...
Страница 23: ...880 pps for 10Base T Ethernet port 148 800 pps for 100Base TX FX Fast Ethernet port 1 488 000 pps for Gigabit Fiber Ethernet port MAC address 8K MAC address table Packet Buffer 1Mbits LED Per unit Po...
Страница 24: ...the document listed by UL and its output must comply with L P S Power Consumption 7 Watts Install DIN rail kit for DIN type cabinet and wall mount ear for wall mount install Operating Temp 20o C to 6...
Страница 25: ...22 CE EN61000 4 11 CE EN61000 4 12 CE EN61000 6 2 CE EN61000 6 4 Stability testing IEC60068 2 32 Free fall IEC60068 2 27 Shock IEC60068 2 6 Vibration...