JCL50F LED Portable Radio Controlled
Solar Helipad and Taxiway Light
6 / 8
Operation and set up:
Designed to be almost maintenance-free, the JCL50F requires minimal attention, though the following maintenance and
servicing information is provided to help ensure the life of your Lansing product.
1.Cleaning Solar Panels - occasional cleaning of the solar panels may be required. Using a cloth and warm soapy water,
wipe off any foreign matter before rinsing the panels with fresh water.
2.Battery Check - inspection of batteries should be performed every three years (minimum) to ensure that the charger,
battery and ancillary electronics are functioning correctly. Using a voltage meter, check that the battery voltage is at least
12 volts under 100mA load, and ensure all terminals are clear of foreign matter.
3.O-Ring Check - inspect the condition of the O-ring for damage, wear or if it is brittle, and replace if necessary. The O-ring
should be a rubber texture to ensure a complete and even seal.
JCL50F Long Term Battery Storage & Maintenance
If the JCL50F is to be placed in storage for an extended period please follow the below information. The batteries inside the
lights must always be stored in a fully charged state.
Always make sure the ON/OFF switch is in the OFF position.
All batteries will discharge over time and the rate of discharge is dependent on temperature. If the light is being stored in
temperatures greater than 40°C the battery will discharge faster.
The JCL50F is fitted with a charge port that can be used to charge the battery and test the battery voltage. Please check the
battery regularly and recharge if necessary. Charge the battery via the external charging port on the base of the unit. Only
attach the plug with your hand, do not use multi- grips to attach the plug.
Turn the ON/OFF switch to the ON position and place unit in the sun for 2-4 days.
NOTICE:
Care must be taken to observe the polarity of each wire before they are connected. To ensure waterproofing of the unit,
make sure that there is a satisfactory seal.
Installing the Light Head Assembly on the Solar Unit
After servicing, it will be necessary to reinstall the light head on the solar unit.
1.Connect the 4 bullet connectors
2.Ensure the O-ring seal on the top of the solar chassis is in place, clean and lightly greased
3. Feed the wires into the corner of the solar unit