
37
9.
For the rear rack installation, slide
the rail to aim and engage the bolts
on the rail’s rear end with the two
available holes on the post, and the
rail assembly will click into place.
10.
Stretch both of the Inner Rails out
to their fullest extent. You will
hear a click sound when they are
fully stretched and locked.
11.
Hold the system with its front
facing you, lift the chassis and
gently engage the brackets on the
system while aligning them with
the Inner Rails as shown in the
image, and then push the system
into the cabinet.
The Inner Rail will click
when it is fully stretched.
Click
Click
Содержание NCA-2513
Страница 42: ...NCA 2513 User Manual 42 Trusted Computing...
Страница 44: ...NCA 2513 User Manual 44 Super IO Configuration...
Страница 48: ...NCA 2513 User Manual 48 H W Monitor...
Страница 50: ...50 Status LED Configuration Feature Options Description Status LED OFF GREEN RED Configures Status LED color...
Страница 66: ...66 South Bridge Chipset Configuration...
Страница 72: ...72 IQAT Configuration Feature Options Description IQAT Enabled Disabled Hides IQAT device from and OS...
Страница 84: ...NCA 2513 User Manual 84...