Lang PFL 120 Скачать руководство пользователя страница 5

Operation 

B

D

LANG

A

C

E

F

 

Controls 

The controls on your proofer are simple and easy to operate. 
 

Indicator Lamp 

Glows when power Switch is turned on. 

Power Switch 

Press UP to turn the unit On, press DOWN to turn the unit Off. 

C Temperature 

Control 

Dial  

The six temperature ranges for proofing are 80

°

F 105

°

F  The 

six temperature ranges for holding are 125

°

F-150

°

F.  

Indicator Lamp 

Glows when unit is calling for heat 

Humidity Control Dial 

Turning the dial clockwise increases the humidity level. 

Timer 

Set for One Hour Maximum 

Startup 

1.  Open the door to the left of the control panel and fill the water tray with HOT water. 
2.  Set the Power Switch to the on position. 
3.  Set the Temperature Dial to the desired temperature. 
4.  Set the Humidity Dial to the Medium position (adjust as necessary to gain the desired humidity). 
5.  Allow the proofer to preheat for 1 hour. 
6. Load 

product. 

Shut door and keep closed. 

8. Set 

timer. 

9.  Refill water pan as required during the day. 

Proofing General 

Proofing is one of the most important and delicate stages in baking.  About 50% of the product 
volume is created in the proofer.  Proofing accelerates the fermentation of yeast in a warm moist 
environment causing the dough to rise.  The temperature of the proofer should be set for 110 
degrees.  The humidity should be set between  medium high and high.  For optimum results, rolls 
should be removed from the hot proofer and transferred to the cold proofer at minimum proof.  This 
will ensure that they can be held of 40 minutes without becoming over-proofed. 

Содержание PFL 120

Страница 1: ...10 Sunnen Drive St Louis MO 63143 3800 Part Number 2M W742 Ph 314 678 6314 Fax 314 781 2714 Rev A www langworld com May 21 2007 Installation Operation Maintenance and Service Instructions Hinged Proo...

Страница 2: ...Installation 3 RECEIVING THE APPLIANCE 3 DATA PLATE INFORMATION 3 ELECTRICAL CONNECTION 4 Operation 5 CONTROLS 5 STARTUP 5 PROOFING GENERAL 5 PROOFING SPECIFICS 6 HOLDING CABINET 6 Maintenance 7 CLEA...

Страница 3: ...t within 15 days of delivery All packing material should be kept for inspection Do not return damaged merchandise to Lang Manufacturing Company File your claim with the carrier Uncrate the appliance a...

Страница 4: ...d supply and 16 7 amps Supply wire size must be 14 gauge or larger to carry the load for one proofer The plug type is NEMA S 20P match the plug to the corresponding NEMA S 20R for the receptacle recep...

Страница 5: ...osition 3 Set the Temperature Dial to the desired temperature 4 Set the Humidity Dial to the Medium position adjust as necessary to gain the desired humidity 5 Allow the proofer to preheat for 1 hour...

Страница 6: ...ofing temperatures are used for products such as breads and rolls Never exceed 105 F temperatures over 107 F will kill the fermentation process of the yeast 6 A product has fully proofed when it doubl...

Страница 7: ...ng cabinet is constructed entirely of stainless steel Very little maintenance is required Periodically clean the unit with a hot soap and water solution or commercial stainless steel cleaner Wipe the...

Страница 8: ...MR120 208 240 24V40VA 1 PFL 120V 2E 40101 19 CIRBD SI TEMP CNTRL NO 1 PFL 120V 2E 41100 19 SENSOR PROOFER450o CONN 1 PFL 120V 2J 30801 01 TIMER MECHANICAL LONG 1 PFL 120V 2J 31601 09 PILOT LAMP 120V B...

Страница 9: ...9 Wiring Diagram...

Страница 10: ......

Страница 11: ......

Страница 12: ...STAR INTERNATIONAL HOLDINGS INC COMPANY Star Holman Lang Wells Bloomfield Toastmaster 10 Sunnen Drive St Louis MO 63143 U S A 314 678 6303 www star mfg com...

Отзывы: