
7
UNPACKING
Receiving the Oven
Upon receipt, check for freight damage, both visible and concealed. Visible
damage should be noted on the freight bill at the time of delivery and signed
by the carrier's agent. Concealed loss or damage means loss or damage,
which does not become apparent until the merchandise has been unpacked.
If concealed loss or damage is discovered upon unpacking, make a written
request for inspection by the carrier's agent within 15 days of delivery. All
packing material should be kept for inspection. Do not return damaged
merchandise to Lang Manufacturing Company. File your claim with the
carrier.
Location
Prior to un-crating, move the oven as near to its intended location as
practical. The crating will help protect the unit from the physical damage
normally associated with moving it through hallways and doorways.
Un-crating
The oven will arrive completely assembled inside a wood frame and
strapped to a skid.
Cut the straps and remove the wood frame.
CAUTION:
THE OVEN WEIGHS 225 LBS. FOR SAFE HANDLING,
INSTALLER SHOULD OBTAIN HELP AS NEEDED, OR
EMPLOY APPROPRIATE MATERIALS HANDLING
EQUIPMENT (SUCH AS A FORKLIFT, DOLLY, OR PALLET
JACK) TO REMOVE THE UNIT FROM THE SKID AND
MOVE IT TO THE PLACE OF INSTALLATION.
CAUTION:
ANY STAND, COUNTER OR OTHER DEVICE ON WHICH
THE OVEN WILL BE LOCATED MUST BE DESIGNED TO
SUPPORT THE WEIGHT OF THE OVEN.
CAUTION:
SHIPPING STRAPS ARE UNDER TENSION AND CAN
SNAP BACK WHEN CUT.
Remove Oven from skid and place in intended location.
Содержание FCOFL-AT
Страница 16: ...16 WIRING DIAGRAM 208 240...
Страница 17: ...17 WIRING DIAGRAM 480...
Страница 22: ...1 2 5 4 6 7 8 9 10 11 12 13 11 10 9 8 3 SK2290 Rev 7 30 07 Model FCOF FCOFL DOOR ASSEMBLY F6S DOOR ASSEMBLY...
Страница 24: ...1 16 2 3 4 5 7 9 10 6 8 11 12 13 14 15 SK2291 Rev 7 30 07 Model FCOF SUB Can Assembly F6S Can Assembly...
Страница 30: ......
Страница 31: ......