F-661-0321
2-13
Hydraulic Hose Installation
1. Install Elbow Fittings into Lift Cylinder Ports.
2. LH Fold Cylinder Ports, install Elbow Fittings.
3. RH Fold Cylinder Rod End port, install an Elbow
Fitting and In base end Port install an Adapter Fitting.
4. Attach hoses to Cylinders and Manifold.
5. Install Male Couplers on the ends of the Male O-Ring
Hose ends and insert them into the Female Coupler
on the Drawbar.
6. Secure Hoses with Tie Wraps.
Figure 2-12: Hydraulic Hose Installation
FRONT
Hose Asm,
3/8 x 22
Hose Asm,
3/8 x 36
Male Coupler
8 O-Ring
Hose Asm,
3/8 x 22
Hose Asm,
3/8 x 64
Hose Asm,
3/8 x 72
Hose Asm,
3/8 x 30
Adapter, 8MJ x 8MOR
Elbow, 8MJ x 8MOR
Elbow,
8MJ x 8MOR
Elbow, 8MJ x 8MOR
Hydraulic Cylinder
5 x 42 (WFP38-46)
5-1/2 x 42 (WFP50-52)
RH
LH
Hydraulic
Cylinder
4 x 20
Elbow,
8MJ x 8MOR