background image

2-1

Chapter 2

Assembly

CAUTION

WARNING

NOTE

Refer to the repair parts manual 7D524 for identification 
of parts and for the approximate relationship of the parts 
in assembly.

To ensure alignment of assemblies, 

leave the nuts 

l

oose until completion 

of final assembly. Use lock 

washers or flat washers as specified. Spread all cotter 
pins.

After completion of final assembly, tighten all nuts
evenly 

to prevent misalignment, distortion or binding.

Tighten all screws and nuts to the recommended torques.

Using blocks or other supports, block up the Frame 
approximately 36”. Be sure that it is secure and cannot 
topple. 

IMPORTANT

• If pre-assembled parts or fasteners are temporarily 

removed, remember where they go. It is best to keep 
parts separated.

• Check that all working parts move freely, bolts are tight 

and cotter pins spread.

• Refer to the Torque Table for proper torque valves. 

Note the different torque requirements for bolts with 
lock nuts. 

See Page 4-1

.

“Left” and “Right” refer to directions seen as if standing 
behind the machine and facing in the direction of forward 
travel.

Main Frame Assembly

1.

Place the frame on blocks at least 36-42 inches high 
for the assembly of the machine. 

2.

See Figure 2-2 

for the dimensional location of the 

Upper and Lower Hitch Brackets.

3.

Assemble Upper Hitch Bracket to the center of the 
Front Frame Tube. Slide Upper Hitch Bracket Plate 
in the slot of the Upper Hitch Bracket and under the 
Front Frame Tube. Secure with 5/8-11 x 6 Bolts and 
Lock Nuts. 

See Figure 2-1.

4.

Place 1-5/16 x 2-1/8 spacer between the top holes of 
the Upper Hitch Bracket and place the LH and RH 
Braces on either side of the Bracket. Insert 1-8 x 6 
Bolt and secure with Lock Nut. Install braces to the 
rear of the Frame with 3/4-10 x 2-1/2 Bolt, 
Lockwasher and Nut.

5.

Assemble LH and RH Lower Hitch Brackets to the 
Front Frame Tube. Secure with 5/8-11 U-Bolts and 
Lock Nuts. 

6.

Determine the category of tractor and Length of 
Shank that will be used and install the Upper and 
Lower Hitch pins into the Hitch Brackets.

 See 

Figures 2-1, 2-3 and 2-4.

Tighten all hardware to the recommended torques. 

See 

Page 4-1

.

Manual Storage Canister

Install the Manual Storage canister to the frame with 
Hose Clamps. 

See Figure 2-1

.

SMV Sign

Attach the SMV Mount about 4 inches left of center on 
the rear Frame Tube with 1/2-13 U-Bolt and Flange Lock 
Nuts. 

See Figure 2-1

. Install SMV Sign to Mount with 

5/16-18 x 1 Bolts, Flat Washers and Lock Nuts.

Do not work on or under this machine unless 
securely 

blocked and supported by a hoist or 

tractor or by other sufficient means.

Do not attempt to lift heavy parts (such as the 
frame, rock shaft, and pull hitch) manually. Use a 
hoist or a fork lift to move these parts into 
position.

Содержание Brillion CPP7

Страница 1: ...175rev1113 7D525 LANDOLL CORPORATION 1900 North Street Marysville Kansas 66508 785 562 5381 800 428 5655 WWW LANDOLL COM Chisel Plow 3 Bar Mounted Models CPP7 through CPP12 Operator s Manual...

Страница 2: ......

Страница 3: ...s 1 4 2 Assembly Main Frame Assembly 2 1 Frame Assembly Dimensions 2 3 1 Ft Frame Extensions 2 6 2 Ft Frame Extensions 2 7 Shank Installation 2 8 Spring Clamp Shank Assembly 2 13 Rigid Clamp Shank Ass...

Страница 4: ...ance General Torque Specifications 4 1 Fasteners 4 2 Tires 4 2 Wheel Hub Lubrication 4 2 Lubricating Wheel Hub 4 2 Lubrication Spring Shank Clamp 4 2 Storage 4 3 5 General Reference and Specifications...

Страница 5: ...designations in this manual are determined by facing the direction the implement will travel during field operation unless otherwise stated Owner Assistance If customer service or repairs are needed c...

Страница 6: ...tors lights and slow moving vehicle sign as required Slow moving tractors and towed implements can create a hazard when driven on public roads They are difficult to see especially at night Do not tow...

Страница 7: ...priate for the job Avoid loose fitting clothing Because prolonged exposure to loud noise can cause hearing impairment or hearing loss wear suitable hearing protection such as earmuffs or earplugs Tire...

Страница 8: ...ADJUSTMENT OR REPAIRS OR WHEN NOT IN USE 5 KEEP ALL PERSONS AWAY FROM MACHINE DURING HITCHING AND OPERATING 6 SLOW DOWN BEFORE MAKING SHARP TURNS OR USING THE BRAKE DRIVE SLOWLY OVER ROUGH GROUND SID...

Страница 9: ...INTRODUCTION AND SAFETY INFORMATION 1 5 Figure 1 3 7 and 9 Shank Model Decal Locations CPP7 9 Decals 1 1 2 1 1 1 1 2 3 3 3 3 4 5 4 5 4 4 6...

Страница 10: ...1 6 7D525 INTRODUCTION AND SAFETY INFORMATION Figure 1 4 10 and 12 Shank Model Decal Locations CPP10 12 Decals 4 5 4 1 1 6 4 5 1 1 2 3 3 3 3 2 1 1 4...

Страница 11: ...INTRODUCTION AND SAFETY INFORMATION 1 7 Figure 1 5 11 Shank Decal Locations CPP11 Decals 1 1 1 1 6 4 4 4 4 5 4 5 2 4 1 1 3 3 3 3 3 3 2...

Страница 12: ...1 8 7D525 INTRODUCTION AND SAFETY INFORMATION Table provided for general use NOTES...

Страница 13: ...h Brackets 3 Assemble Upper Hitch Bracket to the center of the Front Frame Tube Slide Upper Hitch Bracket Plate in the slot of the Upper Hitch Bracket and under the Front Frame Tube Secure with 5 8 11...

Страница 14: ...e Lock Nut 1 2 13 Flat Washer 5 16 Bolt 5 16 18 x 1 Spacer Lock Nut 1 8 U Bolt 5 8 11 Bolt 1 8 x 6 Lynch Pin 1 4 x 1 1 4 Pin 1 x 4 5 Upper Hitch Bracket Bracket Plate Lock Nut 5 8 11 Bolt 5 8 11 x 6 S...

Страница 15: ...ions Left and Right refer to directions seen as if standing behind the machine and facing in the direction of forward travel Figure 2 2 Frame Assembly Dimensions 5HI 5HI 33 33 RZHU LWFK UDFNHW 5 RZHU...

Страница 16: ...Lower Hitch Pin Position Lower Hitch Pin Orient CAT 2 Free Link 26 Shank C 1 View AA CAT 2 Free Link 32 Shank B 1 View AA CAT 2 Quick Coupler 26 Shank B 2 View BB CAT 2 Quick Coupler 32 Shank A 1 View...

Страница 17: ...ASSEMBLY 2 5 Figure 2 4 Lower Hitch Orientation View AA View BB View CC...

Страница 18: ...xtensions Install a 1 Ft Frame Extensions on each 4 Hole Plate on the outer tubes of the Frame with 5 8 11 x 2 Bolts Lockwashers and Nuts Figure 2 5 1 Ft Extensions CPP Op1FtExt 1 Ft Extension Bolt 5...

Страница 19: ...ockwashers and Nuts Secure the front of the extension by placing a 4 hole plate on the inside of the frame tube Secure with 5 8 11 x 5 Bolts Lockwashers and Nuts Figure 2 6 2 Ft Extensions CPP Op4FtEx...

Страница 20: ...h the Shank Assemblies to the frame in the locations indicated in Figure 2 7 through 2 12 Shank Assemblies are shipped with all the necessary hardware to mount the shanks to the frame Figure 2 7 CPP7...

Страница 21: ...ASSEMBLY 2 9 Figure 2 8 CPP9 Shank and Shovel Locations 5 5 5 5 5 33 6KDQN...

Страница 22: ...2 10 7D525 ASSEMBLY Figure 2 9 CPP10 Shank and Shovel Locations 5 5 5 5 5 33 6KDQN...

Страница 23: ...ASSEMBLY 2 11 Figure 2 10 CPP11 Shank and Shovel Locations 5 5 5 5 5 5 33 6KDQN...

Страница 24: ...2 12 7D525 ASSEMBLY Figure 2 11 CPP12 Shank and Shovel Locations 5 5 5 5 5 5 33 6KDQN...

Страница 25: ...exposed See Figure 2 13 Figure 2 13 Spring Tension Rigid Clamp Shank Assembly Remove the front 3 4 10 x 7 1 2 Bolt Lockwasher and Nut and loosen the 5 8 11 Nuts so that they are flush with the end of...

Страница 26: ...e 2 7 to 2 11 to each Shank with 7 16 14 x 2 1 2 Special Plow Bolts and Flanged Lock Nuts See Figure 2 16 LH means that the soil is thrown left and RH means that the soil is thrown right If another ar...

Страница 27: ...tach Gage wheel to frame with 4 hole plate 5 8 11 x 3 Bolts Lockwashers and Nuts See Figure 2 17 Tighten all hardware to the recommended torques and check periodically for looseness See Page 4 1 Figur...

Страница 28: ...ight Side and Yellow Tape is Left Side 6 Plug the Lamp Harness into the Light Module route both cord plugs with Green Tape along the top right side of the rear frame Route the plugs up through the Lig...

Страница 29: ...receptacle free of dirt and corrosion 2 Make sure the 7 pin connector is inserted ALL the way in With tighter fitting pins operator ma think the connector is all the way in but really isn t 3 Make sur...

Страница 30: ...DQN LJKW UDFNHW PEHU DPS 5HG DPS 0RGXOH UDFNHW 5 609 UDFNHW 5HG DPS PEHU DPS LJKW UDFNHW 609 DFN 9LHZ 6KDQN 0DFKLQH 6KRZQ 6KDQN 6KDQN 6KDQN 5HG DPS PEHU DPS LJKW UDFNHW 0RGXOH UDFNHW 5 609 UDFNHW 609...

Страница 31: ...9 ElectLayout CPP7 9 ElectLayout Amber LED Red LED Bolt 1 4 20 x 1 1 2 Lock Nut 1 4 20 7 Pin Harness U Bolt 1 2 13 Bolt 1 4 20 x 1 1 2 Lock Nut 1 4 20 Light Module Module Mount U Bolt 3 8 16 Light Br...

Страница 32: ...2 LED Warning Lights Layout Lock Nut 1 4 20 7 Pin Harness Lamp Harness Light Bracket 1 4 20 x 1 1 2 Flange Lock Nut 1 2 13 Red LED Amber LED Light Module Lock Nut 1 4 20 U Bolt 1 2 13 Light Bracket U...

Страница 33: ...ElectLayout CPP11 ElectLayout Lamp Harness Module Bracket Light Module U Bolt 3 8 16 Bolt 1 4 20 x 1 1 2 Lock Nut 1 4 20 Flange Lock Nut 3 8 16 7 Pin Harnes Red LED Amber LED Lock Nut 1 4 20 Bolt 1 4...

Страница 34: ...2 22 7D525 ASSEMBLY Table provided for general use NOTES...

Страница 35: ...s at an angle to each other Make the first pass shallower than the second pass NOTE Before operating your Brillion machine check all hardware for tightness Use the Tightening Torque Table in Chapter 4...

Страница 36: ...ion with the 7 pin connector Field Operation Three Point Hitch Type 1 Lower the Chisel Plow to the ground and pull it a few feet at the approximate desired depth 2 Check for front to rear levelness Le...

Страница 37: ...attachments etc may reduce implement load carrying capabilities 6 Check that tires are of proper size load rating and inflated to manufacture specifications before transporting Check wheel lug bolts t...

Страница 38: ...3 4 7D525 OPERATION Table provided for general use NOTES...

Страница 39: ...50 65 81 90 112 9 16 12 55 62 80 100 110 137 9 16 18 60 75 90 112 130 162 5 8 11 75 94 110 137 170 212 5 8 18 85 106 130 162 180 225 3 4 10 130 162 200 250 280 350 3 4 16 150 188 220 275 320 400 7 8 9...

Страница 40: ...x 15 6 Ply Tire and should be inflated to 40 PSI When Re Installing the Wheel Nuts tighten to 50 foot pounds using the sequence in Figure 4 1 Then tighten to full torque of 85 100 ft lbs Figure 4 1 St...

Страница 41: ...Repaint all areas where the original paint is worn off d Grease all exposed metal surfaces of shanks and points e Apply a light coating of oil or grease to exposed cylinder rods to prevent them from...

Страница 42: ...4 4 7D525 MAINTENANCE Table provided for general use NOTES...

Страница 43: ...bs to 825 lbs 248 kg to 371 kg 550 lbs to 825 lbs 248 kg to 371 kg Shank Trip Height 5 5 in 138 mm 5 5 in 138 mm Chisel Points Available 2 in 50 8 mm Reversible Point or 3 in 76 2 mm Reversible Twiste...

Страница 44: ...0 lbs to 825 lbs 248 kg to 371 kg 550 lbs to 825 lbs 248 kg to 371 kg 5 5 in 138 mm 5 5 in 138 mm 5 5 in 138 mm 2 in 50 8 mm Reversible Point or 3 in 76 2 mm Reversible Twisted Point 2 in 50 8 mm Reve...

Страница 45: ...Document Control Revision Log Date Revision Improvement s Description and Comments 07 2001 Initial Release 11 2013 1113 Updated to the Landoll format Added LED Warning Lights...

Страница 46: ...Plow 3 Bar Mounted Models CPP7 through CPP12 Operator s Manual Re Order Part Number 7D525 LANDOLL CORPORATION 1900 North Street Marysville Kansas 66508 785 562 5381 800 428 5655 WWW LANDOLL COM 175re...

Отзывы: