3-9
RIGID SHEAR SHANK AND SHOVEL INSTALLATION (AFTER JULY, 2008)
3-9.1
Attach each shank assembly to each
clamp assembly using 3/4-10 x 4 hex head
cap screws and hex lock nuts in the top hole
and 5/8-11 x 5 hex head cap screw and hex
lock nut in the lower hole
(See Figure 3-7)
.
IMPORTANT
5/8 X 3/4 X 1-1/4 CONNEX BUSHINGS SHOWN
IN THE DRAWING ARE INSTALLED AT THE
LANDOLL CORPORATION.
3-9.2
Install 2 x 1 x 18 spikes or 1/2 x 4 x 26
twisted shovels onto shanks as follows:
a.
Connect 2 x 1 x 18 spike to each shank us-
ing 1/2-13 x 3 hex head cap screws, flat
washers, and heavy hex nuts
(See Figure
3-7)
.
b.
Connect 1/2 x 4 x 26 twisted shovels to
each shank using 1/2-13 x 3 plow bolts, flat
washers, and heavy hex nuts.
See Figures
2-1 - 2-10 for recommended locations of
right hand and left hand shovels.
IMPORTANT
RIGHT AND LEFT TWISTED SHOVELS ARE
DETERMINED BY DIRECTION OF DIRT FLOW
WHEN FACING THE DIRECTION OF TRAVEL.
3-17
Содержание 2110
Страница 3: ...MODEL 2110 COULTER CHISEL OPERATOR S MANUAL PURCHASED FROM DATE ADDRESS PHONE NO SERIAL NO i...
Страница 4: ...NOTES ii...
Страница 8: ...NOTES 1 2...
Страница 22: ......
Страница 53: ...NOTES 3 31...
Страница 54: ......
Страница 67: ...NOTES 4 13...
Страница 68: ......
Страница 71: ...NOTES 5 3...