ASSEMBLY INSTRUCTIONS
3-7
Straight Shank Assembly
1.
The spring clamp weldments are already located on
the frame at the proper spacing.
2.
Attach shank bracket weldment to the spring clamp
weldment using plastic bearings, 3/4-10 x 8-1/2 hex
head cap screw, and 3/4-10 hex lock nut.
3.
Install coil spring assembly between top hole of
bracket weldment and top hole of spring clamp
weldment. Secure with 1-8 x 8-1/2 hex head cap
screw and hex lock nut.
IMPORTANT
Do not overtighten bolts as the springs must be free
to pivot.
4.
Install clamp weldment to bottom holes of bracket
weldment using 1-8 x 6-1/2 hex head cap screws and
hex lock nuts.
5.
Assemble shank to clamp weldment using 1-8 x 4
hex head cap screws and hex lock nuts.
6.
If installing wear guards (used on straight heavy
duty), install wearguard into clamp weldment and
secure in place with 5/16-18 x 3-1/2 hex head cap
screw and hex lock nut
Install the
spikes on the shanks using the roll pin provided.
Содержание 1550 Series
Страница 2: ......
Страница 4: ...ii F 298 0111 Edition...
Страница 9: ...STANDARD SPECIFICATIONS 2 3...
Страница 12: ...2 6 F 298 0111 Edition STANDARD SPECIFICATIONS...
Страница 26: ...3 14 F 298 0111 Edition ASSEMBLY INSTRUCTIONS Notes...
Страница 31: ...OPERATION AND MAINTENANCE 4 5 Notes...
Страница 32: ...4 6 F 298 0111 Edition OPERATION AND MAINTENANCE...
Страница 34: ...5 2 F 298 0111 Edition TROUBLESHOOTING GUIDE Notes...
Страница 35: ......