3-5 MAIN FRAME ROCKSHAFT
3-5.1
Lay rockshaft
(See Figure 3-5)
on frame
with wheel spindle holes in rockshaft lift arm
toward front of frame.
3-5.2
Lubricate inside of rockshaft bearings and
upper reinforcement bar surfaces.
Notes:
10’-10” frame requires four bearings: Two inner
and two outer.
9’-6” frame only requires two inner bearings.
3-5.3
Both Frames: Install rockshaft bearings
with a reinforcement bar under frame at each
bearing location.
10’-10” Frame: Also install one reinforcement
bar between rockshaft and frame at each
outer bearing location.
3-5.4
Attach all bearings and bars to frame with
3/4” x 8-1/2” cap screws, lock washers, nuts.
Note: Position grease fittings toward rear.
3-5
Figure 3-5 Rockshaft Installation
Содержание 1230 Series
Страница 3: ...MODEL 1230 SERIES COULTER CHISEL OPERATOR S MANUAL PURCHASED FROM DATE ADDRESS PHONE NO SERIAL NO i...
Страница 8: ......
Страница 12: ...NOTES 2 4...
Страница 31: ...3 19 Figure 3 42 10 10 Main Frame Assembly Layout Walking Beam Axle 12 Shank Spacing...
Страница 32: ...3 20 Figure 3 43 10 10 Main Frame Assembly Layout Walking Beam Axle 15 Shank Spacing...
Страница 33: ...3 21 Figure 3 44 10 10 Main Frame Assembly Layout 19 Folding Model...
Страница 34: ...3 22 Figure 3 45 10 10 Main Frame Assembly Layout 21 and 23 Folding Models...
Страница 36: ...NOTES 3 24...
Страница 55: ...4 19 Figure 4 28 Rockshaft Figure 4 29 Walking Beams Figure 4 30 Wheels Figure 4 31 Disc Cutters...
Страница 60: ...NOTES 4 24...
Страница 62: ...NOTES 5 2...
Страница 63: ......