
H 71 0200 0215 f en - ZMQ202 / ZFQ202 - User Manual
Gyr
Installation / De-installation
41/88
4 Installation
/
De-installation
4.1 Prerequisites
Danger
Galvanic isolation
The measuring circuits and auxiliary circuits (additional power supply, tariff
control input, synchronisation input, transmitting contacts, communication
interfaces) must be galvanically isolated.
Danger
Voltage paths must be fused
When installing the meter, all voltage paths (measurement voltage and all
auxiliary circuits such as the auxiliary power supply and the tariff control
voltage) must be fused by max. 6 A delay fuses.
Warning
Separation of voltage connections and communication lines
The voltage connections must be physically separated from the
communication lines in accordance with local laws and / or regulations.
Note
Recommendation
We recommend that twisted and shielded cables are used for the
communication lines.
Содержание ZFQ202
Страница 4: ...Landis Gyr H 71 0200 0215 f en ZMQ202 ZFQ202 User Manual 4 88 ...
Страница 28: ...Landis Gyr H 71 0200 0215 f en ZMQ202 ZFQ202 User Manual 28 88 Description of Unit ...
Страница 54: ...Landis Gyr H 71 0200 0215 f en ZMQ202 ZFQ202 User Manual 54 88 Installation De installation ...
Страница 66: ...Landis Gyr H 71 0200 0215 f en ZMQ202 ZFQ202 User Manual 66 88 Operation ...
Страница 74: ...Landis Gyr H 71 0200 0215 f en ZMQ202 ZFQ202 User Manual 74 88 Service ...
Страница 84: ...Landis Gyr H 71 0200 0215 f en ZMQ202 ZFQ202 User Manual 84 88 Maintenance ...
Страница 86: ...Landis Gyr H 71 0200 0215 f en ZMQ202 ZFQ202 User Manual 86 88 Disposal ...