Section 1: Assembly & Set-Up
RTA1558, RTA1566, & RTA1574 Rotary Tillers 311-252M
12/19/18
12
Check Driveline Minimum Length
Figure 1-7
Check Driveline Collapsible Length
1.
Park tractor and implement on a level surface.
2. Raise implement until gearbox input shaft is level
with tractor power take-off shaft. Securely block
implement at this height to keep unit from lowering.
3. Shut tractor down without removing support blocks.
Refer to
4. Disconnect driveline from the tractor’s power take-off
shaft.
5. Remove outer driveline (tractor end) from inner
driveline to separate the two profiles.
6. Attach outer driveline to the tractor’s power take-off
shaft. Refer to steps 5-7 under
7.
Hold inner and outer drivelines parallel to each other.
If dimension “A” is greater than or equal to 1", then
skip to
“Check Driveline Maximum Length”
page 13. Otherwise continue with step 8.
13588
IMPORTANT:
A driveline that is too long can bottom
Shorten Driveline Length
Figure 1-8
8. If dimension “A” was less than 1", shorten driveline as
follows:
a. Measure 1" (
“B1”
dimension) back from outer
driveline shield and make a mark at this location
on the inner driveline shield.
b. Measure 1" (
“B2”
dimension) back from the inner
driveline shield and make a mark at this location
on the outer driveline shield.
9. Remove outer driveline from the tractor power take-
off shaft and inner driveline from the implement’s
gearbox shaft.
10. Cut off non-yoke end of inner driveline as follows:
a. Measure from end of inner shield to scribed mark
(
“X”
dimension) and record.
b. Cut off inner shield at the mark. Cut same amount
off the inner shaft (
“X1”
dimension).
11. Cut off non-yoke end of outer driveline as follows:
a. Measure from end of outer shield to scribed mark
(
“Y”
dimension) and record.
b. Cut off outer shield at the mark. Cut same amount
off the outer shaft (
“Y1”
dimension).
12. Remove all burrs and cuttings.
13. Continue with
“Check Driveline Maximum Length”
13588