![background image](http://html1.mh-extra.com/html/lancer/9000-series/9000-series_installation-manual_3467269005.webp)
5
17. Route appropriate tubing from the syrup pump/syrup supply
location to the CO
2
inlet and connect tubing to CO
2
inlet.
18. Feed all tubing, power cord, and drain line through the count
-
er top cutout.
19. Connect tubing routed from carbonated water inlet and plain
water inlet to the “U” fitting at the water supply.
20. Turn on water supply and check for leaks.
21. Plug in the unit to a grounded electrical outlet then turn the
power switch, at the top of the unit, to begin building an ice
bank.
A
B
C
A. CO
2
Inlet
B. CO
2
Line
C. Pressure Relief Valve
The dispenser must be properly electrically grounded
to avoid serious injury or fatal electrical shock. The
power cord has a three-prong grounded plug. If a
three-hole grounded electrical outlet is not available,
use an approved method to ground the unit. Follow all
local electrical codes when making connections. Each
dispenser must have a separate electrical circuit. Do
not use extension cords. Do not connect multiple
electrical devices on the same outlet.
!
WARNING
Before installing regulator, assure that a seal (washer
or o-ring) is present in regulator attachment nut.
!
ATTENTION
Installing CO
2
Supply
1. Connect high pressure CO
2
regulator assembly to CO
2
cylinder or bulk system.
-
Thread regulator nut on to tank, then
tighten nut with wrench
A. CO
2
Regulator
B. Outlet
C. Wrench
D. CO
2
Supply
A
B
C
D
2. Connect a 1/4” nut, stem and seal to CO
2
regulator outlet.
4. Connect tubing routed from the CO
2
inlet at the unit to one of
the low pressure CO
2
regulator manifold outlets.
5. Connect tubing routed from the syrup pump location to the
second outlet of the low pressure CO
2
regulator manifold.
A. CO
2
Regulator
B. Wrench
C. 1/4” nut, Stem
D. CO
2
Supply
A
B
C
D
3. Route appropriate tubing from the low pressure CO
2
regulator manifold location to the 1/4” nut, stem on the high
pressure CO
2
regulator attached to source and connect
tubing.
A dedicated CO
2
regulator is required to supply the CO
2
inlet at the unit as well as to all remote syrup pumps.
!
ATTENTION
A
B
C
D
A. Line to Dispenser
B. Line to Syrup Pumps
C. Line to CO
2
Regulator
D. CO
2
Regulator Manifold
Do not use mechanical devices or other means to
accelerate the defrosting process, other than those
recommended by the manufacturer.
H
WARNING
Never energize the machine if there is any trace of
damage. Contact Lancer Customer Service for
assistance.
H
WARNING