
VII-18
February 2008
Legacy
VII-19
February 2008
Legacy
A valve is provided to connect the high and low pressure lines essentially equal-
izing the system pressure. The main gear will then free fall of its own weight and
the nose wheel gas strut will drive the nose wheel down. This “gear dump” valve
is located left side by the pilot’s right knee.
Note:
This valve is located by
the pilot’s right knee.
Its operation should be
checked periodically.
“Original” Hydraulic Power Pack Installation
Fig. 2
Produce a lightening hole. Also
serves as an access hole should it be required.
Battery box
Power
grid
1” x 3” x 3-1/8”
phenolic spacer blocks
A/C Up
Fwd.
Содержание Legacy
Страница 6: ...Legacy ...
Страница 8: ...I 2 February 2008 Legacy Intentionally Left Blank ...
Страница 20: ...I 14 February 2008 Legacy NOTES ...
Страница 21: ...I 15 February 2008 Legacy NOTES ...
Страница 22: ...I 16 February 2008 Legacy NOTES ...
Страница 24: ...II 2 February 2008 Legacy Intentionally Left Blank ...
Страница 34: ...II 12 February 2008 Legacy NOTES ...
Страница 35: ...II 13 February 2008 Legacy NOTES ...
Страница 36: ...II 14 February 2008 Legacy NOTES ...
Страница 38: ...III 2 February 2008 Legacy Intentionally Left Blank ...
Страница 47: ...III 11 February 2008 Legacy NOTES ...
Страница 48: ...III 12 February 2008 Legacy NOTES ...
Страница 50: ...IV 2 February 2008 Legacy Intentionally Left Blank ...
Страница 69: ...IV 21 February 2008 Legacy NOTES ...
Страница 70: ...IV 22 February 2008 Legacy NOTES ...
Страница 72: ...V 2 February 2008 Legacy Intentionally Left Blank ...
Страница 90: ...V 20 February 2008 Legacy NOTES ...
Страница 91: ...V 21 February 2008 Legacy NOTES ...
Страница 92: ...V 22 February 2008 Legacy NOTES ...
Страница 94: ...VI 2 February 2008 Legacy Intentionally Left Blank ...
Страница 108: ...VI 16 February 2008 Legacy NOTES ...
Страница 110: ...VII 2 February 2008 Legacy Intentionally Left Blank ...
Страница 134: ...VII 26 February 2008 Legacy NOTES ...
Страница 135: ...VII 27 February 2008 Legacy NOTES ...
Страница 136: ...VII 28 February 2008 Legacy NOTES ...
Страница 138: ...VIII 2 February 2008 Legacy Intentionally Left Blank ...
Страница 158: ...VIII 22 February 2008 Legacy NOTES ...
Страница 160: ...IX 2 February 2008 Legacy Intentionally Left Blank ...
Страница 168: ...IX 10 February 2008 Legacy Emergency Procedures ...
Страница 169: ...IX 11 February 2008 Legacy Emergency Procedures ...
Страница 170: ...IX 12 February 2008 Legacy Emergency Procedures ...
Страница 171: ...IX 13 February 2008 Legacy Emergency Procedures Continued ...
Страница 172: ...IX 14 February 2008 Legacy Normal Procedures ...
Страница 173: ...IX 15 February 2008 Legacy Normal Procedures Continued ...
Страница 174: ...IX 16 February 2008 Legacy Performance System Description ...
Страница 175: ...IX 17 February 2008 Legacy Servicing and Maintenance Approved by ___________________ Date __________________________ ...
Страница 176: ...IX 18 February 2008 Legacy NOTES ...
Страница 178: ...X 2 February 2008 Legacy Intentionally Left Blank ...