42
IT
MEGAPREX N 720N ÷ 1060N
cod. 3541O220 - Rev. 00 - 03/2018
1. INTRODUCTION ......................................................................................................................................................................... 43
2. GENERAL WARNINGS .............................................................................................................................................................. 43
3. CERTIFICATION ......................................................................................................................................................................... 43
4. TECHNICAL AND CONSTRUCTIONAL CHARACTERISTICS, DIMENSIONS ........................................................................ 43
4.1
Description of the appliance ........................................................................................................................................................................ 43
4.2
Operating principle ....................................................................................................................................................................................... 44
4.3
Technical data - Dimensions - Hydraulic connections ................................................................................................................................. 44
4.4
Identification
................................................................................................................................................................................................. 45
5. INSTALLATION .......................................................................................................................................................................... 45
5.1
Packaging .................................................................................................................................................................................................... 45
5.2
Handling ....................................................................................................................................................................................................... 45
5.3
Installation site (Fig. 4) ................................................................................................................................................................................. 45
5.4
Discharge of combustion products (Fig. 5) .................................................................................................................................................. 46
5.5
Hydraulic connections .................................................................................................................................................................................. 46
5.5.1
Supply water .......................................................................................................................................................................................... 46
5.5.2
System feed/return pipes ....................................................................................................................................................................... 46
5.5.3
System fill/drain pipes
............................................................................................................................................................................ 46
5.5.4
Pipes, expansion vessel and safety valves ............................................................................................................................................ 46
5.5.5
Recirculation pump (Fig. 6) .................................................................................................................................................................... 47
5.6
Adjusting the door (Fig. 7) ........................................................................................................................................................................... 47
5.7
Assembly of the burner (Fig. 8) ................................................................................................................................................................... 47
5.8
Connecting the cooling tube to the flame inspection window (Fig. 9)
.......................................................................................................... 47
5.9
Assembling the panels, mod. 720÷1060. Sequence (Fig. 10)
..................................................................................................................... 47
6. CONTROL PANEL (OPTIONAL) ................................................................................................................................................ 48
6.1
LV thermostatic control panel, 2 and 3 burner stages (Fig. 11) ................................................................................................................... 48
6.1.1
Front view of the panel (Fig. 11) .............................................................................................................................................................
49
6.1.2
Diagram of the terminal block electrical connections .............................................................................................................................
49
6.1.3
Wiring diagram for burner and single-phase pump ................................................................................................................................ 50
6.2
EBM (Efficient Boiler Management) control panel (Fig. 12)
......................................................................................................................... 53
6.2.1
Panel (Fig. 12) ........................................................................................................................................................................................ 53
6.2.2
Wiring diagrams ..................................................................................................................................................................................... 54
6.3
Notes about the connections ....................................................................................................................................................................... 58
7. COMMISSIONING ...................................................................................................................................................................... 58
7.1
Preliminary checks ....................................................................................................................................................................................... 58
7.2
First ignition .................................................................................................................................................................................................
59
7.3
Shutting down the boiler ..............................................................................................................................................................................
59
8. MAINTENANCE .......................................................................................................................................................................... 59
8.1
General instructions .....................................................................................................................................................................................
59
8.2
Routine maintenance ...................................................................................................................................................................................
59
8.3
Special maintenance ...................................................................................................................................................................................
59
8.4
Cleaning the boiler (Fig. 13) ........................................................................................................................................................................ 60
8.5
Checking boiler operation ............................................................................................................................................................................ 60
8.6
Checking burner operation .......................................................................................................................................................................... 60
8.7
Troubleshooting ........................................................................................................................................................................................... 61
Содержание MEGAPREX N 720N
Страница 11: ...11 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Schema dei collegamenti ...
Страница 31: ...31 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Esquema de conexionado ...
Страница 51: ...51 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Connection diagram ...
Страница 71: ...71 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Schéma de connexion ...
Страница 91: ...91 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Схема подключения ...
Страница 104: ...104 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Fig 5 Fig 6 5 2 1 4 3 6 Fig 7 ...
Страница 105: ...105 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Fig 8 Fig 9 1 2 3 4 5 6 7 8 11 10 9 12 13 15 17 16 14 Fig 10 ...
Страница 107: ...107 IT MEGAPREX N 720N 1060N cod 3541O220 Rev 00 03 2018 Fig 13 ...