ENGLISH
Second Section - FOR THE INSTALLER
UNPACKING AND DELIVERY CHECKS
When the case with the machine has been received, unpack it as follows:
- Remove the upper cover and the wooden case side walls, take care not to damage the
machine,
-
Remove possible accessories boxes,
-
Remove the protecting cellophane,
-
Make sure that the machine has not been damaged during transport,
- Make sure that all covers and panels have been correctly fixed and that no loosen part is
present,
-
Visually inspect that all electrical components are integral.
TRANSPORT AND INSTALLATION
-
To lift and transport the machine, insert the truck forks under the frame connected to the points
indicated by the yellow adhesives applied on the machine front side (see draw below).
draw
“A”
-
Before plugging the machine, make sure that the supply voltage of the domestic wiring system
and the water supply from water connection corresponds to the ones reported on the rating
plate
- Installation should be carried out by qualified personnel according to the manufacturer's
indications
During instalation, it is recommended to level the machine in order to ensure a correct operation.
The Manufacturer cannot assume any responsability for any damage to persons or
property deriving from the non-observance of the above-specified norms.
For correct installation see draw page 25.
Содержание LP6-ek
Страница 1: ...INSTRUCTIONS MANUAL POT WASHING MACHINE LP31 L ek...
Страница 2: ...2...
Страница 4: ...4...
Страница 9: ...9 INSTRUCTIONS FOR THE USER...
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 33: ...CONNECTIONS SCHEME Black Black Black Black Staples Black Black Staples...
Страница 38: ...09 06 2017 11 45 00...
Страница 39: ...09 06 2017 11 45 00...
Страница 40: ...09 06 2017 11 45 01...
Страница 41: ...09 06 2017 11 45 01...