Lakeshore 26220 Скачать руководство пользователя страница 21

Installation / Operation / Maintenance Manual   

 

 

 

 

 

10/28/2019 

21

 

II)

 

AUTOMATIC TRANSFER SWITCH WILL NOT TRANSFER TO NORMAL 

 

1)

 

Improper Utility Voltage 

Using an appropriately set voltmeter, check the utility voltage on terminals NL1 and NL2 and NL2 to 
NL3 and NL3 to NL1.  If each set of readings indicate the utility line to line voltage, continue to Step 2. 
If the readings do not indicate proper line to line voltage, call the local utility.   

2)

 

Blown Fuse on Normal Source 

Using an appropriately set voltmeter, check the output voltage on terminals NA-1 to NB-1 and NB-1 to 
NC-1 and NC-1 to NA-1.  If each set of readings indicate utility line to line voltage, continue to step 3. 
If the readings do not indicate line to line voltage, replace the defective fuse.   

3)

 

Defective Normal Control Transformer NCT 

Using an appropriately set voltmeter, check the voltage on terminals X1 to X2.  If the voltage is 120 
VAC nominal, check the NCT transformer and/or return to Step 2.  

4)

 

Phase Failure Relay Not Functioning (PFR) 

Using an appropriately set voltmeter, check the voltage on the phase failure relay terminal C to N.O.  If 
the voltage is 120 VAC nominal, the Phase Failure Relay Normal is defective and must be replaced.  If 
the voltage is zero, continue to step 5.  

5)

 

Load Test 

Verify that the Load Test Switch is in the “NORMAL” position. 

6)

 

Defective T Timer 

Using an appropriately set voltmeter, measure the voltage from terminals A to B of the “TNR” Timer.  
If this voltage is 120 Volt Nominal, continue to step 7.  If not, replace the defective “T” Timer. 

7)

 

Defective TNR Timer 

Using an appropriately set voltmeter, measure the voltage from wire 15 to wire 25 of the “TNR” Timer. 
If this voltage is 120 Volt nominal, continue to step 8.  If not, replace the defective “TNR” Timer. 

8)

 

Normal Microswitch (MSN) Defective 

a.

 

Using an appropriately set voltmeter, check the voltage at terminals 15 to 25.  If the voltage is 
120 VAC Nominal, continue to Step b; if voltage is not 120 VAC nominal, continue to Step b; 
if voltage is not 120 VAC nominal, return to Step 7.  

b.

 

Using an appropriately set voltmeter, check the voltage at terminals 16 to 25.  If the voltage is 
120 VAC nominal, continue to Step 9; if voltage is not 120 VAC nominal, microswitch MSN 
and its actuator should be checked and replaced if necessary. 

9)

 

Transfer Motor (TM) Defective 

Using an appropriately set voltmeter, check the voltage at terminals 9 to 25.  If the voltage is 120 VAC 
nominal, replace the motor gear box assembly; if voltage is not 120 VAC nominal, return to Step 8. 
 

Содержание 26220

Страница 1: ...ALLING OPERATING AND MAINTAINING AUTOMATIC TRANSFER SWITCHES AS MANUFACTURED FOR FLORIDA POWER LIGHT WITH ELECTROMECHANICAL CONTROLS Lake Shore Electric Corporation 205 Willis Street Bedford OH 44146...

Страница 2: ...CUMENT IS THE PROPERTY OF Lake Shore Electric Corporation UNDER COPYRIGHT LAW DISTRIBUTION AND REPRODUCTION OF THIS DOCUMENT IN WHOLE OR IN PART IS PROHIBITED WITHOUT PRIOR WRITTEN PERMISSION FROM Lak...

Страница 3: ...ION OF THIS DOCUMENT IN WHOLE OR IN PART THIS DOCUMENT IS THE PROPERTY OF Lake Shore Electric Corporation UNDER LAKE SHORE ELECTRIC AND LIGHT COMPANY BEDFORD OHIO U S A FLORIDA POWER STYLE 2 225A 3P 3...

Страница 4: ...MENT IN WHOLE OR IN PART THIS DOCUMENT IS THE PROPERTY OF Lake Shore Electric Corporation UNDER LAKE SHORE ELECTRIC AND LIGHT COMPANY BEDFORD OHIO U S A FLORIDA POWER 277 480VAC 3P 3 4W 400A FPL230400...

Страница 5: ...hore Electric Corporation UNDER LAKE SHORE ELECTRIC APV 1 5 PROJ CUSTOMER SCALE AND LIGHT COMPANY CHK BEDFORD OHIO U S A FLORIDA POWER STYLE 2 400A 3P 3 4W 277 480 DRN DWG NUMBER APV DESCRIPTION REV B...

Страница 6: ...IS DOCUMENT IN WHOLE OR IN PART THIS DOCUMENT IS THE PROPERTY OF Lake Shore Electric Corporation UNDER LAKE SHORE ELECTRIC APV 1 5 M S NUMBER 0 283 408 090 PROJ CUSTOMER SCALE AND LIGHT COMPANY CHK BE...

Страница 7: ...NJURY AND EQUIPMENT DAMAGE DURING INSTALLATION AND USE OF THIS PRODUCT COMPLY WITH THE NATIONAL ELECTRICAL CODE NEC FEDERAL STATE AND LOCAL CODES AND ALL OTHER APPLICABLE SAFETY CODES MAIN UTILITY EME...

Страница 8: ...y or of fitness for purpose shall apply Lake Shore is not responsible for damage to its equipment through improper installation or use unauthorized repair or modifications or attempts to operate it ab...

Страница 9: ...SWITCHES 16 5 1 GENERAL INFORMATION 16 5 2 INSPECTION AND MAINTENANCE 16 6 TIMING RELAYS 17 7 VOLTAGE RELAYS 17 7 1 VOLTAGE SENSING CLOSE DIFFERENTIAL 17 8 TROUBLESHOOTING GUIDE 19 9 APPENDIXES 22 9 1...

Страница 10: ...Installation Operation Maintenance Manual 10 28 2019 10 PAGE INTENTIONALLY LEFT BLANK...

Страница 11: ...om 16 gauge insulated machine tool wire All control circuits are protected with fuses 2 DESCRIPTION OF OPERATION Normally the transfer switch operates on the preferred power source with the Normal mol...

Страница 12: ...s are made to the common bus at the terminals marked L1 L2 and L3 On three phase four wise transfer switches or single phase three wire transfer switches a neutral bus is provided NOTE Verify that pha...

Страница 13: ...panel A test of the automatic circuitry can be initiated by moving this load test switch to the test position This will cause the normal control circuits to de energize and give a signal to transfer...

Страница 14: ...evices 4 3 REQUIRED MAINTENANCE Please refer to the APPENDIX A for required maintenance on the operating mechanism necessary to maintain your exclusive one year Lake Shore Electric Corporation warrant...

Страница 15: ...enance Manual 10 28 2019 15 Figure 1 LEGEND 1 Manual Handle 2 Drive Arms 3 Adjustment Screw 4 Motor 8 Drive Drums 9 Spring 10 Drive Shoe Pivot 11 Drive Drum Keys 12 Drive Shoe 13 Drive Shore Lining 17...

Страница 16: ...ng return the transfer switch to the proper position A shunt trip may also be provided This allows the breaker to be electrically tripped from a remote location and can also be reset manually 5 2 INSP...

Страница 17: ...any phase falls below the drop out setting the output contacts revert to their de energized state and the LED turns off Pick up and dropout values are adjustable from 70 to 100 of nominal voltage via...

Страница 18: ...nter clockwise 3 Using a small slotted screwdriver turn the pickup potentiometer fully clockwise 4 Apply required level of pickup voltage to the unit 5 Turn the pickup potentiometer slowly counter clo...

Страница 19: ...frequency must be available and within the correct operating limits 3 Control fuses must be in proper working order 4 Control circuit voltage if transformers are used must be 110 to 125 volts 5 Connec...

Страница 20: ...of the ECT If this voltage is 120 Volts nominal check the ECT transformer and or return to step 2 4 Phase Failure Relay Not Functioning PFR Using an appropriately set voltmeter check the voltage on th...

Страница 21: ...ailure Relay Normal is defective and must be replaced If the voltage is zero continue to step 5 5 Load Test Verify that the Load Test Switch is in the NORMAL position 6 Defective T Timer Using an appr...

Страница 22: ...from the edge of the drive shoe indicating slippage Transfer switches utilizing smaller circuit breakers are equipped with a single friction drive arm as they require less force to activate On these...

Страница 23: ...rques are required to be checked every six months in order to maintain the Lake Shore Electric Corporation exclusive one year warranty I TORQUE SOCKET HEAD SCREWS Warning Whenever bus and cable connec...

Страница 24: ...anty I GENERAL ELECTRIC LUG TO MOLDED CASE SWITCH E150 LINE 30 IN LBS F225 LINE 90 IN LBS J600 LINE 60 IN LBS K1200 LINE 200 IN LBS II WESTINGHOUSE LUG TO MOLDED CASE SWITCH DA JA KA LB 6 8 FT LBS 1 4...

Страница 25: ...25 LINE 75 IN LBS J600 LINE 100 IN LBS K1200 LINE 100 IN LBS V WESTINGHOUSE TRIP TO MOLDED CASE SWITCH JA KA DA KCL LB 6 8 FT LBS MA MC 15 FT LBS NB NC LA LC LCL KB HKB JB 6 8 FT LBS VI EATON CUTLER H...

Страница 26: ...be acceptable The torque produced by a motor is approximately proportional to the square of the voltage applied that is a motor that is started at 90 of rated voltage will produce a torque of 90 2 1 o...

Страница 27: ...oltage unbalance condition Consider Figure 3 Triangle ABC represents a balanced voltage source Triangle ABD represents a three phase system in which one phase has dropped to 80 of its nominal voltage...

Страница 28: ...rvoltage relays provide against voltage unbalance when it is calibrated for an 87 drop out The Lake Shore Voltage Sensing Relay will drop out on a 4 voltage unbalance thus limiting the motor overheati...

Страница 29: ...as shown in Figure 6 This time delay helps avoid nuisance undervoltage indications as may occur during system transients The inverse time characteristic allows a 1 5 second delay before the relay de...

Отзывы: