17
•
Insert cable and connect cable to terminals according to terminal diagram
•
Close service cap
•
Connect the cooling unit with hoses
•
Open lid
•
Fill cooling unit with water (about 5.0 l)
CAUTION
The water level must be always above fins, otherwise reduced cooling capacity!
•
Let the cooling unit run for about 10 minutes to deaerate the water circuit
•
Check the water level, if necessary, refill water
•
Close lid
Position of closing lid and electrical connectors
Содержание WL 5000
Страница 1: ...WL 5000 Specification and User Manual...
Страница 3: ......
Страница 5: ...5 8 Removal for Service 21 9 Wear Parts and Spare Parts 22...