LAGUNATOOLS.COM
18
9.
Check alignment (parallelism)
of the brush head to the conveyor. Measure
from the bottom of the brush bristles to the top of the conveyor belt on the right
and left side. If the brush head is not parallel;
A. loosen the two bearing bolts (that secure the bearing to the machine)
on the lower side of the brush, Fig. 8.
B. Raise the bearing on the low side by using a hex wrench in the center
of the bearing stud and rotate both equally until the brush head is
parallel.
C. Tighten the bolts attaching the bearing to the machine bracket.
Figure 8: Aligning Brush Head
Dust Collection, Connection/Assembly
1. Connect dust collection
hose to each 4” port on machine. Minimum of *600
CFM per port.
*NOTE: The CFM requirement can vary depending on brush head, application(s)
and material.
Figure 9: Dust Ports
Bearing Bolts
Bearing Stud
Dust Ports (3)
Содержание SuperMax SuperBrush 49
Страница 1: ...OWNERS S MANUAL SuperBrush 49 Lagunatools com...
Страница 23: ...LAGUNATOOLS COM 23 WIRING DIAGRAMS POWER CONNECTIONS Figure 14 Power Connections Wiring...
Страница 24: ...LAGUNATOOLS COM 24 INTERNAL WIRING Figure 15 Internal Wiring...
Страница 30: ...LAGUNATOOLS COM 30 Exploded Views STAND ASSEMBLY Figure 22 Stand Assembly...
Страница 33: ...LAGUNATOOLS COM 33 HEAD ASSEMBLY Figure 23 Head Assembly without brush...
Страница 35: ...LAGUNATOOLS COM 35 CONVEYOR ASSEMBLY Figure 24 Conveyor Assembly...
Страница 41: ...LAGUNATOOLS COM 41 NOTES LAGUNA TOOLS...
Страница 42: ...LAGUNATOOLS COM 42 7291 Heil Avenue Huntington Beach CA 92647 Ph 800 234 1976 www lagunatools com 100820...