Laguna Tools Smartshop CBX Скачать руководство пользователя страница 11

11 

 

Ground Wire for Protection- 

The total number of ground pins is 3 or more. The material is pure copper or galvanized. The 
diameter of the ground pins is 15mm or .62 In. and the length is more than 1.5m or 5 Ft. 

Environmental Requirements- 

Requires a well-ventilated, dust-free, non-corrosive, and leak-free site environment. The control 
unit, servo unit and display are the core of the machine tool, and the machine should be 
protected from electromagnetic interference. ***Keep away from Arc Welding and EDM 
(Electrical Discharge Machining), so as not to affect the normal operation of the machine and 
laser. 

Unloading Requirements- 

1.) When the Crate containing your newly purchased Smartshop® Laser/CBX

 

is delivered, it will be 

delivered “Curbside”, in other words the Machine will be delivered in front of the Driveway of 
one’s Garage/Shop or Workspace. (****It is the Purchasers responsibility of moving the Machine 
into His or Hers Garage/Shop or Workspace.****)

 

2.) One should obtain a Crane: Hydraulic crane / crane (10T or above, 4 groups of 10T rings, 2 10M 
long, 10T straps).  

3.) One should obtain a Forklift: The forklift can fork items weighing 10T or more. 

 
 

Содержание Smartshop CBX

Страница 1: ...1...

Страница 2: ...Up Page 6 Page 10 Set Up Ground Requirments for Installation Page11 Page15 CBX Damage Notifications Page 16 Installation Foundation Instructions Page 17 Page 18 Cooling Water Requirements Page 19 20...

Страница 3: ...3 Technical Parameters...

Страница 4: ...h operation the CBX uses water forced air cooling a dust prevention system and an automatic lubrication system to ensure longevity and consistency The Smartshop Laser CBX Fiber Laser cutting Machine i...

Страница 5: ...5 CBW Fiber Laser Unit Footprint...

Страница 6: ...6 Machine Sight Set Up...

Страница 7: ...7 Machine Sight Set Up Cont d 100 28 In 85 12 In...

Страница 8: ...8 Machine Sight Set Up Cont d 102 28 In 74 02 In 83 66 In 88 70 In The left and right sides front and back sides of the machine the Machine must be least 1 2 meters or 48 Inches from the workshop wall...

Страница 9: ...9 Machine Sight Set Up Cont d The left and right sides front and back sides of the machine the Machine must be least 1 2 meters or 48 Inches from the workshop wall WALL WALL 48 00 In 48 00 In...

Страница 10: ...Three phase five wire system 220V 480V 50Hz capacity depends on laser type and capacity 2 Quality Three phase imbalance 2 5 line voltage fluctuation 5 Single Phase 220V 5 Must be equipped with a stabi...

Страница 11: ...Keep away from Arc Welding and EDM Electrical Discharge Machining so as not to affect the normal operation of the machine and laser Unloading Requirements 1 When the Crate containing your newly purch...

Страница 12: ...12 4 To Open Crate Acquire some standard tools for taking apart the Crate a Hammer b Pry Bar c Wire Cutters d Cordless Drill...

Страница 13: ...13 5 Cut all straps only on the Crate 6 Unscrew a series of Screws at the Base of Crate using a Cordless Drill...

Страница 14: ...14 7 Unscrew and Remove Side Panels of Crate...

Страница 15: ...any or our Laguna Tools Facilities but that does not mean the Machines would not experience any damage in transit 2 Before one Signs the Bill of Lading See Example Below when the Trucking Company dro...

Страница 16: ...16 Installation Foundation Instructions Steel Plate for Machine Foot Requirements...

Страница 17: ...Bolt Type M12 100 NO 12 or a Dia X 4 1 2 In Long Steel Expansion Bolt 3 Placing the Machine on the Right Place of Base Anchor then Welding Area 4 In Theory The Poured Concrete Column size should be 4...

Страница 18: ...ed Water Mineral Mater is prohibited When the Ambient Temperature Ambient Temperature The Air Temperature of any object or environment where equipment is stored is below 0 Celsius or 32 Degrees Fahren...

Страница 19: ...protection function If it has a leakage protection function the rated leakage protection current should not be less than 300mA and it is recommended to be more than 500mA If the rated leakage protecti...

Страница 20: ...perature gaseous state High pressure liquid bottle withstands 4 5MPA vaporizer withstands 4 5MPA flow rate 1 0 cubic meters minute output pressure 3 0MPA Air Use high pressure air to cut the board Pur...

Страница 21: ...d Requirements Cont d Note The gas tank must be painted yellow and affixed with a safety warning sign It must be used in strict accordance with the special gas operating regulations Schematic Diagram...

Страница 22: ...ystem to check if the machine is horizontal 1b If it is not horizontal use a lifting jack to jack up the machine then use a wrench to tighten the screw to adjust the height 1c If the height difference...

Страница 23: ...nt and guide rails with a clean cloth 1e Put the leveling instrument on the Y Axis rail guide and the Beam Guide to check if the machine is horizontal If it is not horizontal use a lifting jack to jac...

Страница 24: ...stall Display Screen 2a Install the display screen first to install the display bracket then screw the display screen to the bracket Connect the VAG Signal Cable and the Screen Cable 2b Install the di...

Страница 25: ...25 Installation Operational Instructions Steps 2d Connect the VAG Signal Cable 2e Connect the Power Cable and the Screen Cable...

Страница 26: ...pipe of Water Chiller is connected the machine with the same label corresponding number Connect both the MAIN LOOP WATER INLET and MAIN LOOP WATER OUTLET to the laser source then connect both the REFL...

Страница 27: ...l Instructions Steps 3b Add or Fill 32L of requires of Distilled or Deionized Water or Purified Water to the water chiller tank until the water level gauge shows that the water chiller tank is full Mi...

Страница 28: ...cut according to their own needs can be under pressure 2 8MPA The oxygen and nitrogen interface sign are on the back of the machine Connect the oxygen and nitrogen interface to corresponding gas cyli...

Страница 29: ...the cylinder and fully open to ensure the air flow The inner gas meter shows the remaining amount of gas in the bottle and the outer gas meter shows the output pressure which can be pressurized with t...

Страница 30: ...30 Installation Operational Instructions Steps 5b Turn the knob Step 6 Install exhaust fans including ducts and fans the hose clamps is in the tool 6a Connect the machine and fan with the air pipe...

Страница 31: ...the mouse receiver open the back cover of the mouse and you can see the mouse receiver connect the mouse receiver and the remote control receiver to the machine USB interface 7b Open the back cover o...

Страница 32: ...eiver to the machine USB interface Step 8 Check the voltage with the multimeter 8a Before turning on the machine use a multimeter to check whether the voltage of the main circuit air switch input term...

Страница 33: ...r switch of the electrical cabinet main circuit 4 Turn on the computer 5 Turn on the emergency stop button and press the laser switch button 6 Open the Software Cypcut Click the Machine to return to t...

Страница 34: ...34 Installation Operational Instructions Steps 9b Turn on the regulated power supply 9c Turn the knob to ON as to turn on the water chiller machine...

Страница 35: ...35 Installation Operational Instructions Steps 9e Turn On the Computer 9f Check if the chiller is working normally 9d Turn on the air switch of the electrical cabinet main circuit 9g Turn on the laser...

Страница 36: ...Steps Warning Before turning on the laser source Operators must have consulted Laguna Tools Customer Technical Service Center Toll Phone 1 800 234 1976 or at Customerservice lagunatools com 9h Check...

Страница 37: ...cut Software and confirm that the X Y Z 3 Axis limit sensor works normally Make sure it is normal then Click on the CNC page then Click the X Axis and Y axis back to the origin 10b Press the handle di...

Страница 38: ...38 Installation Operational Instructions Steps 10f Click on the CNC page then Click the X Axis back to the Origin...

Страница 39: ...ection key to slowly move the laser cutting head along the X Axis 10h Click the Y Axis back to the Origin 10j Press the handle direction key to slowly move the laser cutting head along the Y Axis 10k...

Страница 40: ...allation Operational Instructions Steps 10l Hold the Remote Control Quick Button do not release 10m Press the Arrow Keys to control the machine quickly move multiple times to check if it is working no...

Страница 41: ...41 Warranties Delivery Protocol...

Страница 42: ...42 Dealer Machinery Warranty...

Страница 43: ...termined on a case by case basis Software purchased through Laguna Tools Inc is not covered under this warranty and all technical support must be managed through the software provider Normal user alig...

Страница 44: ...44...

Страница 45: ...rds provided by the manufacturer Parts under warranty are shipped at Laguna Tools Inc s cost either by common carrier FEDEX ground service or a similar method Technical support to install replacement...

Страница 46: ...g In the event the item part is determined to be damaged due to lack of maintenance cleaning or misuse abuse the customer will be responsible for the cost to replace the item part plus all related shi...

Страница 47: ...47 Laguna Tools Packaging Laguna Tools RMA Example...

Страница 48: ...le Laguna Tools is not responsible for errors or omissions Specifications subject to change Machines may be shown with optional accessories 2021 Laguna Tools Inc LAGUNA and the LAGUNA Logo are the reg...

Страница 49: ...nual Revision Record Date of Change Revision Engineering Design Change Description 4 14 2021 1 Developed New Manual for the CBX Fiber Laser 4 20 2021 2 Removed Metal Plate Cutting Reference Added Foot...

Страница 50: ...50...

Отзывы: