3700 Sagamore Parkway North . PO Box 5729 . Lafayette, IN 47903 USA . Ph: 765-423-1505
Electronic PathFinder Maze System
6
(F)
Installation of the Runway/Bridge Walls
(Closed Configuration ONLY)
*See diagram on page 11
Required tools:
1/16” hex wrench (included)
5/16” nut driver
1. All polycarbonate walls (
F1
,
F3
, and
F7
) are shipped with a special covering that helped
protect the walls against scratching. The covering must be removed from all walls. This is
easily done by peeling back the corner of the covering and continuing to pull until the
covering is off.
2. Begin by installing 2 bridge walls (
F1
) on either side of the bridge. The walls are mounted on
the outer side of the bridge wall, with the hex screws inserted through the mounting holes
from the inside of the bridge wall (
F5
), through the mounting hole (
F2
), and secured with a
kep nut on the outside of the wall. Be sure that the notch (
F4
) is in the correct location, at the
intersection of the bridge and runway. At this point, finger tighten the kep nuts.
DO NOT
TIGHTEN WITH THE NUT DRIVER!
3. Continue by installing 2 arm walls (
F3
) on either side of the runway using the same
procedure outlined in step #2 above.
4. Install the end wall (
F7
) on the end of the runway using the same basic procedure outlined in
step #2 above.
5. Install the corner connectors (
F8
) and the straight connectors (
F9
) in the notched areas of the
wall as illustrated in the assembly diagram.
6. Tighten all kep nuts (
F6
) with the nut driver.
7. Repeat steps #2 - #6 for all remaining arms.