Lacunza SILVER 800 Скачать руководство пользователя страница 5

Lacunza Silver 800/1000 Zero Clearance Box Assembly Instructions

 

June 12, 2022

 

 

 

1.4

 

Now you can join the two Stand Sides with the four Stand Horizontal Long Brackets. You 

can line them up with the Long Brackets go on the outside of each corner. Start by lining 

up one side first, then move to the other side.  

 

 

 

 

 

 

 

 

 

1.5

 

You will then need 16 x Self-Tapping Screws, to join everything and make the stand. Note 

that the Bottom Tabs in the stand can also be used to fix the frame to the floor. Ensure 

the base is secured to the floor, using fixings appropriate for the flooring structure. The 

floor must be able to support the weight of the heater, flue, and fuel  load, which is 

approximately 300kg. Refer to Step 2.2, to see how the Tabs can be bent out.  

 

 

 

 

 

 

 

 

 

 

 

 

1.6

 

This concludes the assembly for the Stand, and you can now prepare for the assembly of 

the Zero Box. You will begin assembly with the stand, so if you haven’t secured your stand 

down, we suggest you move it close to where the unit will be installed with the Zero Box, 

if you haven’t so already, as the Zero Box can be quite heavy to move around.  

 

Содержание SILVER 800

Страница 1: ...NJUNCTION WITH THE INSTALLATION MANUAL FOR THE SILVER 800 AND SILVER 1000 MODELS TESTED IN ACCORDANCE WITH AS NZS 4013 2014 and AS NZS 2918 Please read through this manual thoroughly before installing...

Страница 2: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 2 Zero Clearance Parts List Check all the parts are supplied before beginning the assembly...

Страница 3: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 3...

Страница 4: ...de end frames for the stand first For each end you will use 2 x Stand Horizontal Short Brackets and 2 x Stand Vertical Brackets Lay them out as seen in the image below 1 2 Line up the corners by align...

Страница 5: ...o be used to fix the frame to the floor Ensure the base is secured to the floor using fixings appropriate for the flooring structure The floor must be able to support the weight of the heater flue and...

Страница 6: ...completed Stand The front of the bottom panel should be flat in line with the front stand face 2 2 Flip up the Top Tabs to stop the Bottom Plate from moving around Ensure you do this on both sides the...

Страница 7: ...Bottom Panel 2 5 Grab either the RHS LHS Side Panel and slot it into the appropriate sides This is indicated with the circle cut outs on each Side Panel which should be on the bottom side and the thre...

Страница 8: ...es and use 9 x Self Tapping Screws Use the circle cut outs in the Back Panel to pull the sheet towards you which should help when you are inserting the Self Tapping Screws Again don t tighten the Self...

Страница 9: ...ping Screws for the sides A total of 10 x Self Tapping Screws and 3 x Self Tapping Screws If you are installing for the Silva 800 then go to Step 4 before continuing Once the Top Panel is on tighten a...

Страница 10: ...ed hook is fixed to the 300mm Flue Outer Casing You will need 3 x Self Tapping Screws for each Flue Bracket A total of 6 x Self Tapping Screws The 200mm Flue slides through the top of the Zero Clearan...

Страница 11: ...ILVER 1000 to SILVER 800 4 1 If you are installing the Silver 1000 then you are completed with assembly If you are installing for the Silver 800 you will need to assemble the 2 x Side Fill Ins before...

Страница 12: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 12 Completed Zero Clearance Box with Stand for Lacunza Silver 800 1000...

Страница 13: ...be made of a heat resistant material 6 Underside mantle shelf shall be no closer than 550mm from the top of the appliance hot air outlet the mantle shelf shall extend no further than 250mm into the ro...

Страница 14: ...istant material 6 Underside mantle shelf shall be no closer than 550mm from the top of the appliance hot air outlet the mantle shelf shall extend no further than 250mm into the room 7 Underside mantle...

Страница 15: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 15 Clearance Diagrams Silver 800...

Страница 16: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 16 Silver 1000...

Отзывы: