Import Safety and Clearance Information 

 

Silver 1000 

 

1.

 

Venting in the ceiling of the enclosure around the outer triple flue skin must be a 

minimum of 335,405mm

2

, evenly spaced around the outer casing.  

 

2.

 

Timber framing in the ceiling cavity must be a minimum of 1230mm above the zero box 

and must not restrict the 335,405mm² air flow around the flue casing.  

 

3.

 

The outer galvanised casing of the flue (300mm) must be raised 65mm above the zero 

clearance box.  

 

4.

 

The inner galvanised casing of the flue (250mm) must be vented into the zero clearance 

box outer skin and be sealed to prevent venting into the enclosure.  

 

5.

 

The combustible enclosure must have 2 vents, each vent must be a minimum 9,820mm². 

The bottom vent must be 50mm above the floor, the top vent must be 500mm below the 

ceiling. They must be installed on the front of the combustible enclosure and must be 

made of a heat resistant material.  

 

6.

 

Underside mantle shelf shall be no closer than 550mm from the top of the appliance hot 

air outlet, the mantle shelf shall extend no further than 250mm into the room.  

 

7.

 

Underside mantle key shall be no closer than 500mm from the top of the appliance hot 

air outlet, the mantle key shall extend no further than 25mm into the room.  

 

8.

 

Mantle uprights shall be no closer than 150mm from the side of the appliance and the 

mantle uprights shall be no thicker than 40mm.  

 

9.

 

The front wall of the enclosure must be made of non-combustible material to a height of 

400mm above the appliance and must extend 250mm either side of the appliance down 

to the floor protector.  

 

10.

 

First internal wall noggin must be made of a non-combustible material above the zero 

clearance box.  

 

11.

 

Combustible material to the rear/rear wall of the enclosure must be a minimum of 

100mm from the rear of the appliance zero clearance box.  

 

12.

 

Combustible material to side/side wall of the enclosure must be a minimum of 100mm 

from the side of the appliance zero clearance box.  

 

13.

 

Hearth Thickness is 6mm, please see diagram below for size. 

Содержание SILVER 800

Страница 1: ...NJUNCTION WITH THE INSTALLATION MANUAL FOR THE SILVER 800 AND SILVER 1000 MODELS TESTED IN ACCORDANCE WITH AS NZS 4013 2014 and AS NZS 2918 Please read through this manual thoroughly before installing...

Страница 2: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 2 Zero Clearance Parts List Check all the parts are supplied before beginning the assembly...

Страница 3: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 3...

Страница 4: ...de end frames for the stand first For each end you will use 2 x Stand Horizontal Short Brackets and 2 x Stand Vertical Brackets Lay them out as seen in the image below 1 2 Line up the corners by align...

Страница 5: ...o be used to fix the frame to the floor Ensure the base is secured to the floor using fixings appropriate for the flooring structure The floor must be able to support the weight of the heater flue and...

Страница 6: ...completed Stand The front of the bottom panel should be flat in line with the front stand face 2 2 Flip up the Top Tabs to stop the Bottom Plate from moving around Ensure you do this on both sides the...

Страница 7: ...Bottom Panel 2 5 Grab either the RHS LHS Side Panel and slot it into the appropriate sides This is indicated with the circle cut outs on each Side Panel which should be on the bottom side and the thre...

Страница 8: ...es and use 9 x Self Tapping Screws Use the circle cut outs in the Back Panel to pull the sheet towards you which should help when you are inserting the Self Tapping Screws Again don t tighten the Self...

Страница 9: ...ping Screws for the sides A total of 10 x Self Tapping Screws and 3 x Self Tapping Screws If you are installing for the Silva 800 then go to Step 4 before continuing Once the Top Panel is on tighten a...

Страница 10: ...ed hook is fixed to the 300mm Flue Outer Casing You will need 3 x Self Tapping Screws for each Flue Bracket A total of 6 x Self Tapping Screws The 200mm Flue slides through the top of the Zero Clearan...

Страница 11: ...ILVER 1000 to SILVER 800 4 1 If you are installing the Silver 1000 then you are completed with assembly If you are installing for the Silver 800 you will need to assemble the 2 x Side Fill Ins before...

Страница 12: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 12 Completed Zero Clearance Box with Stand for Lacunza Silver 800 1000...

Страница 13: ...be made of a heat resistant material 6 Underside mantle shelf shall be no closer than 550mm from the top of the appliance hot air outlet the mantle shelf shall extend no further than 250mm into the ro...

Страница 14: ...istant material 6 Underside mantle shelf shall be no closer than 550mm from the top of the appliance hot air outlet the mantle shelf shall extend no further than 250mm into the room 7 Underside mantle...

Страница 15: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 15 Clearance Diagrams Silver 800...

Страница 16: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 16 Silver 1000...

Отзывы: