INSTALLER’S MANUAL
CLUNY
Page 9 of 42– US –
Cabinet preparation (CLUNY)
:
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
mm
914
330 457
930
150
230
175
395
20
60
765
865
1005
51
660
’’
36
13
18 36 5/8
5
15
/
16
9
1
/
16
6
7
/
8
15
9
/
16
13
/
16
2
3
/
8
30
1
/
8
34
1
/
16
39
9
/
16
2
26
Cabinet preparation (CLUNY 1400 – Left)
:
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
mm
914
330 457
930
150
230
175
395
20
60
765
865
1410
51
660
’’
36
13
18 36 5/8
5
15
/
16
9
1
/
16
6
7
/
8
15
9
/
16
13
/
16
2
3
/
8
30
1
/
8
34
1
/
16
55
1
/
2
2
26
Fig. 3 b
Fig. 3 a
B
D
K
G
I
C
J
E
F
H
L
M
N
N
O
A
Gas
connection
on range
Electrical connection
on range
Place electrical and gas
stub out in this area
B
D
K
G
I
C
J
E
F
H
L
M
N
N
O
A
Gas
connection
on range
Electrical connection
on range
Place electrical and gas
stub out in this area
Содержание CLUNY
Страница 2: ...Page 2 of 42 US...
Страница 8: ...Page 8 of 42 US Date de mise jour 12 03 10 Indice 14...
Страница 26: ...INSTALLER S MANUAL CLUNY Page 26 of 42 US...
Страница 28: ...Page 28 of 42 US...
Страница 42: ...USER S MANUAL CLUNY Page 42 of 42 US CAUTION Use NO chlorinated cleaners to clean this unit...