background image

 

User Manual LabModul 240

 

Page 8

 

www.labtec.de

 

A 2

 

testing demand valves

 

2

 

Demand valve 

 

2.1

 

Leakage: Pressure rise after #

 

min at 

--

#

 

mbar negative pressure / overpressure

 

2.2

 

Tightness of the dosing valve: Pressure change with pending medium pressure to # min. at # mbar 

 

2.3

 

Opening pressure / activating pressure on # l/min exhausting

 

2.4

 

Static pressure  / overpressure of demand valves

 

Test 

step

 

Operation

 

Comments

 

Controls

 

2.1.1

 

Couple demand valve to test head

 

Use mark specific adaptors.

 

 

2.1.2

 

Seal the medium

-

pressure hose of the regulator 

with a cap or connect it to the medium pressure 

connection (E) on the device. 

 

 

E

 

2.1.3

 

Test vacuum with pushbutton (6) to setpoint

 

-

 Set # mbar. Turn on the stopwatch

 

If necessary, relieve with button (7) 

and approach to setpoint. 

 

 

and/or

 

Test overpressure with push button (5) to set-

point. Set + # mbar. Turn on the stopwatch. 

 

If necessary, relieve with button (7) 

and approach to setpoint. 

 

 

2.1.4

 

Read off the pressure change on the LCD dis-

play (LP) after a specified time # min and com-

pare with the setpoint. 

 

 

 

 

 

 

 

 

All further tests require high pressure! 

 

Regulator in conjunction with a

 

Connect the SCBA to the test device. 

 

Medium pressure hose from the PA 

regulator of a SCBA must with

 

Device connection (D) to be connec-

ted. 

 

D

 

2.2.1

 

Open the bottle of the SCBA .

 

Medium pressure flows into the device 

 

 

2.2.2

 

Close the bottle of the SCBA .

 

Tester / DUT are under pressure .

 

 

2.2.3

 

Relieve low pressure with button (7) and set to 

setpoint. 

 

Regulator must be closed, close if ne-

cessary. 

 

 

2.2.4

 

Read off the pressure change on the LCD dis-

play (LP) after a specified time # min and com-

pare with the setpoint. 

 

 

 

 

 

 

 

2.3.1

 

Open the bottle of the SCBA .

 

Medium pressure flows into the device 

and is in the device. 

 

 

2.3.2

 

Switch on pump with switch (9) and flow of 

-

10 l / 

min. produce. 

 

until the regulator opens

 

 

2.3.3

 

Read the opening / closing pressure of the regu-

lator on the LCD display (LP). 

 

 

 

2.3.4

 

Switch off pump with switch (9). 

 

 

 

 

 

 

 

2.4.1

 

With the bottle open, read the static overpres-

sure of the open LA on the LCD display (LP) and 

compare with the setpoint. 

 

Testing only for positive pressure regu-

lators 

 

 

2.4.2

 

Close the bottle and relieve the medium pres-

sure with the button (12). 

 

at the end of the test or continue with 

further tests. 

 

 

Содержание LabModul 240 Series

Страница 1: ...2 3 device description 3 4 technical data 3 5 operating elements 4 6 component description 5 7 description of the operating elements 5 8 commissioning 6 9 care and maintenance 6 Attachments Performin...

Страница 2: ...ed and certified Labtec service technician and tested and calibrated by him or her using a Labtec calibration device The list of current certified employees training partners and service technicians i...

Страница 3: ...fitted at the factory Connection requirements A 230 240 V 50 60 Hz power supply is requi red to operate the test stand As medium pressure connection Euro coupling and nipple are available as standard...

Страница 4: ...10 l min switching valve 9 Inhalation 10 l min switching valve 10 Fill CPS switching valve 11 Empty CPS switching valve 12 Relieve medium pressure tactile valve A test stand housing B Panel optional C...

Страница 5: ...um pump With the built in vacuum pump the required air currents are generated and the probe is infla ted or deflated The desired air flow rate can be set in the software from 2 12 l min Processor The...

Страница 6: ...g nipple of the medium pressure device connection and the line of the demand valve to the EURO quick coupling of the medium pres sure device connection If the SCBA to be tested does not have a Euro co...

Страница 7: ...specific adaptors 1 2 2 Mount mask on test head pull straps tight inflate test head 3 A few seconds is usually long enough 1 2 3 Adjust negative pressure to exactly mbar 5 By means of pressure relief...

Страница 8: ...with the setpoint All further tests require high pressure Regulator in conjunction with a Connect the SCBA to the test device Medium pressure hose from the PA regulator of a SCBA must with Device conn...

Страница 9: ...ssure flows into the device 3 2 2 Close the bottle of the SCBA Tester DUT are under pressure 3 2 3 Read the medium pressure on the LCD display MP and compare with setpoint 3 2 4 After a specified time...

Страница 10: ...pressure is reached 5 1 8 Lower the pressure to the required internal pres sure with the switch 11 if necessary with but ton 12 approach and turn on the stopwatch Setting the required Settling time 5...

Страница 11: ...h in EEC Guideline 2016 42 EG and EMC 2014 30 EU including all changes and addendums to date thereto The above mentioned product meets the following standards and guidelines Nous Vous Confirmons que l...

Отзывы: