![Labom GA22 Series Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/labom/ga22-series/ga22-series_operating-instructions_3190764003.webp)
BA_067_2019-05_10.00 Inline resistance thermometer
Page 3/4
3.1 Mechanical Installation
Use gaskets, if required, that are suitable for the process connection and resistant to the
media.
The process connection determines the permissible process pressure. Operating the de-
vice beyond its nominal pressure limit, e.g. clamp-connections, requires specially designed
and approved mounting elements.
Before starting operation, check the process connection carefully for leaks under pressure.
3.2 Electrical Connection
Complete the mechanical installation before you connect the device electrically.
Set up all electrical connections while the voltage supply is switched off.
circular connector M12
3-wire
4-wire
transmitter
cable gland
3-wire
2 x 3-wire
Figure 1: Options of the pin assignment