manualshive.com logo in svg
background image

 

 

 

 

  BA_067_2019-05_10.00  Inline resistance thermometer 

Page 3/4 

3.1  Mechanical Installation 

Use gaskets, if required, that are suitable for the process connection and resistant to the 
media. 

  

The  process  connection  determines  the  permissible  process  pressure.  Operating  the de-
vice beyond its nominal pressure limit, e.g. clamp-connections, requires specially designed 
and approved mounting elements. 

  

Before starting operation, check the process connection carefully for leaks under pressure. 

  

3.2  Electrical Connection 

Complete the mechanical installation before you connect the device electrically. 

Set up all electrical connections while the voltage supply is switched off. 

  

circular connector M12 

3-wire 

  

 

4-wire 

  

 

transmitter 

  

 

cable gland 

3-wire 

  

 

2 x 3-wire 

  

 

  

 

Figure 1: Options of the pin assignment 

  

Отзывы: