Product Service 1-800-522-7658
2
C
C
h
h
a
a
p
p
t
t
e
e
r
r
2
2
:
:
P
P
r
r
e
e
r
r
e
e
q
q
u
u
i
i
s
s
i
i
t
t
e
e
s
s
Before you install the glove box, you need to prepare your site for
installation. You must be certain that the area is level and of solid
construction. In addition, a dedicated source of electrical power should be
located near the installation site to power the glove box. Additionally, the
glove box should be strategically placed in the lab to provide efficient
workflow and prevent operator interference from normal traffic flow.
Carefully read this chapter to learn the requirements for your installation site:
•
The support, vibration and preventive requirements.
•
The location requirements.
•
The exhaust requirements for the pressure relief valve.
•
The electrical power requirements.
•
The plumbing requirements for gas, vacuum, and dry train.
•
The space requirements.
Refer to
Appendix B: Precise Glove Box Dimensions
for complete glove box
dimensions.
Refer to
Appendix C:
Precise Glove Box Specifications
for complete
electrical and environmental conditions, specifications and requirements.