Before you install the Filtered PCR Enclosure, you need to prepare
your site for installation. You must be certain that the area is level
and of solid construction. In addition, a dedicated source of
electrical power should be located near the installation site to
power the Filtered PCR Enclosure, and other apparatus.
Additionally, the enclosure should be strategically placed in the lab
to provide efficient workflow.
Carefully read this chapter to learn the requirements for your
installation site:
•
The support, vibration and movement requirements.
•
The location and air current requirements.
•
The exhaust and blower requirements.
•
The electrical power requirements.
•
The space requirements.
Refer to
Appendix B: Dimensions
for complete enclosure
dimensions.
Refer to
Appendix C: Filtered PCR Enclosure Specifications
for
complete filtered enclosure electrical and environmental
conditions, specifications and requirements.
Содержание 3970202
Страница 2: ......
Страница 16: ...11 Product Service 1 800 522 7658 Chapter 3 Getting Started Figure 3 1 Filtered PCR Enclosure Installation...
Страница 23: ...18 Chapter 4 Performance Features and Safety Precautions Figure 4 3 UV Sash Closure 16...
Страница 58: ...53 Appendix B Dimensions and Exhaust Options Figure B 1 Purifier Filtered PCR Enclosure...
Страница 60: ...55 Appendix C Filtered Enclosure Specifications C 1...
Страница 61: ...56 Appendix C Filtered Enclosure Specifications C 2...
Страница 62: ...57 Appendix C Filtered Enclosure Specifications C 3...
Страница 63: ...58 Appendix C Filtered Enclosure Specifications C 4...
Страница 65: ...60...
Страница 66: ......