Installation
2
Mounting
intenance. A minimum of 36" (914mm) from the front of
For best results, install system as close as possible to the point of use
Long pipe runs are not recommended. A heat loss of 1°F for every 10ft (3 meters) of uninsulated pipe can occur..
When determining a mounting location, ensure accessibility of the cabinet enclosure door and other plumbing for service and
maintenance of
the cabinet enclosure
and a minimum of 48" (1219mm) above the top of the cabinet enclosure is needed.
Verify skid system is in final installation location.
Secure the base to concrete at the
(4) mounting locations using suitable concrete anchoring
devices with expansion sleeves (supplied by installer) .
The skids use 3/8" (10mm) or 1/2" (13mm) mounting
hardware/anchoring devices. Install anchors per
manufacturer recommendation. Review and follow all
local codes and ordinances that regulate anchoring.
6