General Rules for Drilling in Concrete :

Concrete drillers must comply with OSHA’s general 

rules. Operators must be adequately trained to use 

concrete drilling equipment, and the drilling equipment 

must be maintained in safe operating condition. 

Operators must wear personal protective equipment 

(PPE), including goggles, long pants, protective noise 

equipment, and steel-toed work boots. Operators 

should wear a respirator whenever exposed to 

hazardous materials. Adequate ventilation is required 

whenever drilling in concrete. 

When locating the rack and preparing to install concrete anchors, 

IT IS MANDATORY to check for buried electrical cables, gas 

tubing, and water or radiant heating piping. DO NOT drill into 

or drive fasteners into concrete slab unless absolutely certain 

it is safe to do so. If in doubt, CONSULT A PROFESSIONAL to 

determine and accurately locate buried objects. Failure to follow 

this warning could result in property damage, serious personal 

injury, or death.

WARNING

  

General Notes on Securing the Rack to a 

Concrete Floor :

This rack system must be properly anchored and secured to 

the floor BEFORE mounting appliances on it. Failure to follow 

these instructions could result in substantial property damage, 

severe personal injury, or death.

WARNING

If seismic anchoring is required, consult state and local codes 

for requirements and instructions. If in doubt as to whether 

seismic anchoring is necessary in your installation location, 

CONSULT A PROFESSIONAL. Failure to follow this warning 

could result in property damage, serious personal injury, or 

death.

WARNING

■ 

Installing Appliance(s) on the Rack: :

1. a. If mounting one(1) appliance to the rack, use a 

10mm Ratchet or Socket Driver and wrench and 

two(2) M6 bolts and included washers and nuts to 

mount the top mounting bracket to the upper beam 

of the rack. See Figure 7.

1. b. If mounting two(2) appliances to the rack, use a 

10mm Ratchet or Socket Driver and wrench and 

two(2) M6 bolts and included washers and nuts to 

mount two(2) top mounting brackets to the upper 

beam of the rack. See Figure 8.

2. 

Hang the appliance(s) from the top mounting 

bracket(s). See Figure 7.

3. Use a 10mm Ratchet/Socket Driver and wrench to 

secure the lower mounting bracket(s) to the lower 

beam, using the two(2) M6 bolts and the included 

washers/nuts. See Figures 9 and 10.

Figure 7 - Single Appliance Mounted on Top Mounting Bracket

Figure 8 -  Secured Top Mounting Bracket for Back to Back 

Appliance Mounting

■ 

General Anchoring Instructions :

1. Position the stand in the installation location.

2. 

Once properly positioned, use a pencil to mark the 

drill holes for the lag screws / expansion anchors. 

Then move away the stand.

3. Prepare to drill holes into the mounting surface 

(either 4” thick minimum Wood Structural Member, 

or 4” thick minimum Concrete Flooring). Consult lag 

screw or expansion anchor manufacturer for predrill 

diameters.

4. After taking appropriate precautions, drill the four 

anchor holes.

5. Reposition the stand with attached seismic anchors 

over the newly drilled anchor holes.

6. Install the washers and lag screws or expansion 

anchors (depending on the installation and code 

requirements).

■ 

Utility Precautions

OSHA rules state that concrete drillers should make 

certain they are not drilling into electrical cables. They 

should use the services of the underground utility and 

cable locating companies prior to drilling. Concrete 

drillers should maintain a minimum distance of 10 feet 

from high voltage power cables.to install the vertical 

posts and waste time.