Installation 

 

 

 3

 

Electric Installation 

 

WARNING     Install product to rated line voltage in 

accordance with current local and 
national codes and regulations. 

WARNING     All heaters must be fused in 

accordance with National Electric Code 
(NEC) for the full load amperage listed 

on the nameplate rating for each 

heater. 

WARNING    Failure to properly ground the unit(s) 

per the National Electric Code could 

result in injury or death. 

ELECTRICAL SPECIFICATIONS FOR HEATER 

(Single-Phase)

kWatts

Amps

Voltage

Model

Min Wire Size 

12 AWG*

6

13

480

LCTEH006J

10 AWG*

10

21

480

LCTEH010J

06 AWG*

18

38

480

LCTEH018J

10 AWG*

6

22

277

LCTEH006E

03 AWG*

18

65

277

LCTEH018E

10 AWG*

5

21

240

LCTEH005D

08 AWG*

6

25

240

LCTEH006D

06 AWG*

10

42

240

LCTEH010D

04 AWG*

15

63

240

LCTEH015D

03 AWG*

18

75

240

LCTEH018D

10 AWG*

5

24

208

LCTEH005H

08 AWG*

6

29

208

LCTEH006H

04 AWG*

10

48

208

LCTEH010H

03 AWG*

15

72

208

LCTEH015H

03 AWG*

18

87

208

LCTEH018H
 

 

 

 

 

ELECTRICAL SPECIFICATIONS FOR HEATER 

(Three-Phase)

 

Min Wire Size

kWatts

Amps

Voltage

Model

12 AWG*

10

13

480

LCTEH010S

10 AWG*

18

22

480

LCTEH018S

06 AWG*

25

51

480

LCTEH025S

10 AWG*

15

21

415

LCTEH015P

08 AWG*

18

26

415

LCTEH018P

10 AWG*

15

22

400

LCTEH015N

08 AWG*

18

26

400

LCTEH018N

10 AWG*

10

16

380

LCTEH010M

10 AWG*

15

23

380

LCTEH015M

08 AWG*

18

28

380

LCTEH018M

06 AWG*

15

36

240

LCTEH015L

06 AWG*

18

43

240

LCTEH018L

08 AWG*

10

28

208

LCTEH010K

06 AWG*

15

42

208

LCTEH015K

06 AWG*

18

50

208

LCTEH018K

   *

Based on the NEC Table 310.15 for 75°C insulated copper wire @ 30°C 
Ambient. Aluminum wire requires larger gauges.

 

Not all available (optional) voltages are listed in the

 

table.

 

 For standard enclosures, remove the four screws 

and take the bottom cover off. For NEMA 4/4X 
enclosures, open the enclosure door.

 

NOTICE!   Any option that requires field wiring must be 

done with 600V cable per the schematic that 
was shipped with the heater. 

NOTICE!   Use a 4-core cable or multi-stranded machine 

tool wire from an approved isolating 3-pole 
switch or circuit breaker. 

NOTICE!   Make sure the electrical cable is the correct 

size to carry 100% of the full load current. See 
table for proper wire sizes.

 

 

Standard: A pre-cut hole is already sized for 

conduit connection. Skip to step C. 

   NEMA 4/4X: Using a hole punch, cut a hole the 

proper size for the conduit connection; large 

enough for the wire size for each heater. The 

connectors need to be rated NEMA 4/4X to 

ensure proper sealing of the enclosure.

 

 Run wires through the appropriate size conduit.

 

 

Connect wires to the system terminal block or 
fused disconnect inside the enclosure.

 

 

Connect the ground wire to the stud provided 
with the “Ground” label beneath it.

 

 

 

I

f unit is ordered with a D1 or DC controller, 

option, the DB9 connector for hookup on a 
standard unit is located on the upper left/hinge 

side of the cabinet. Please review the appropriate 
Special Instruction & Operation Instructions 
section for information regarding controller 

programming and wiring. Proceed to the Start Up 
Checklist once the steps in the Special Installation 
& Operation Instructions section have been 
completed or if you do not have this option.

 

 

 

Содержание H Series

Страница 1: ...TEH006 LCTEH010 LCTEHV010 LCTEH015 LCTEHV015 LCTEH018 LCTEHV018 LCTEH025 Voltage options 208V Single Three Phase 240V Single Three Phase 277V Single Phase 380V Three Phase 400V Three Phase 415V Three...

Страница 2: ...allation 6 7 Electric Installation 8 Start Up Check List 9 Start Up 10 Digital Controller Operation 11 NEMA 4 4X Digital Controller Operation 12 Perform Operational Test No 1 13 Perform Operational Te...

Страница 3: ...nnect power supply before performing any work in the enclosure Failure to ground this system may result in death or serious injury Make sure that all water supply lines have been flushed and then comp...

Страница 4: ...0 F 60 C For applications utilizing quick close valves or solenoid valves it is important to install a hammer arrestor or surge tank close to the point of use to absorb pressure spikes Installation Co...

Страница 5: ...and other plumbing for service maintenance Set heater in a vertical upright position with the water outlet located at top Depending on the application the unit may also be installed rotated clockwise...

Страница 6: ...any drop to eliminate trapped air Install one union on the water inlet side of the heater and another union upstream of the 100 Mesh 150 micron y strainer Install one union on the water outlet side of...

Страница 7: ...Installation 7 2 Plumbing Installation cont...

Страница 8: ...Table 310 15 for 75 C insulated copper wire 30 C Ambient Aluminum wire requires larger gauges Not all available optional voltages are listed in the table For standard enclosures remove the four screws...

Страница 9: ...nstalled after pressure and temperature relief valve on outlet if required by local or national plumbing codes If the hot water process is not at the highest point in the plumbing loop then an automat...

Страница 10: ...ge elements and cause heater malfunction Turn on the connected process observe output temperature rise to setpoint On standard controller set point and output temperatures are located side by side On...

Страница 11: ...the controller Keys and Displays Function Setpoint Up and Down Buttons In the Home Page adjusts the set point in the right display In other pages changes the upper display to a highter or lower value...

Страница 12: ...e of the controller Keys and Displays Function Setpoint Up and Down Buttons In the Home Page adjusts the set point in the right display In other pages changes the upper display to a highter or lower v...

Страница 13: ...he inlet water temperature is equal to or greater than the temperature set on the digital controller 9 Perform Operational Test No 2 Each model has precise specifications for temperature rise capabili...

Страница 14: ...tuation FDS Fused Disconnect Internal fused disconnect interlocks with enclosure door when energized prohibiting access to a live cabinet Select the FDS option for an additional level of safety and co...

Страница 15: ...ere hard water sediment is present in the water To clean the Y Strainer 1 Turn the power off at the circuit breaker panel 2 Shut off the installer supplied cold water isolation valve to the heater 3 R...

Страница 16: ...mperature or faulty sensor Turn power off Check for loose or disconnected wires Check the incoming service connection Voltage must match name plate rated voltage Labels are located on the upper left o...

Страница 17: ...urce A load voltage reading is also helpful Turn power OFF before recording any Ohm readings If the above steps do not solve the problem some additional checks may be performed Follow the schematic to...

Страница 18: ...DC Option Pin Out D1 Option Pin Out Pin Name Description Pin Name Description T R 2 RS 485 Transmit Receive Non Inverting Input Output Negative 3 Return Current Path for Current Pin 4 3 Signal Ground...

Страница 19: ...UINT RWES Remote Set Point Control Mode Process Value 1999 000 to 9999 000 F 1128 000 to 5537 000 C 402 402 Float R Process Value Control Mode OFF 62 Auto 10 Manual 54 1880 2360 Auto UINT RWES Contro...

Отзывы: