La Marzocco FB 70 Скачать руководство пользователя страница 9

For model AV - fig. 2

It is essential to program the quantity of water delivered
by performing the following operations with the utmost
care. In case of doubt or difficulties, please contact our
technical service.

Introduction

The coffee metering system is based on the amount of
water which will be delivered onto the ground coffee,
already set in the filter and the filter holder, which is
measured through a water volume control system, which
is located above the group assembly flange, which con-
nects the group itself to the boiler. Inside each counter
there is a paddle wheel (which we shall call wheel for
simplicity) which rotates as water flows by.
The sequence of the water cycle is as follows:
group - counter
counter - solenoid valve
solenoid valve - diffuser
diffuser - coffee brewing spout
The wheel is designed in such a way as to rotate freely
when water is flowing by; it sends 2 signals, every com-
plete rotation, to the electronic module which processes
them and activates the solenoid valve relay of the corre-
sponding group, as well as the motor pump relay.
Such electronic module also processes the signal sent by
the boiler’s level gauge and consequently activates the
relative solenoid valve relay of the same motor pump.

PROCEDURE FOR PROGRAMMING DOSES - fig. 2

1. activate the DAN3 switch (part 12) by using the spe-
cial key supplied with the standard version;
2. press the 5th button (the one with the spiral symbol,
also used for continuous brewing) of the first control
panel from the left; at this point, the LEDs of all the but-
tons will light up which means that they are ready to be
programmed;

Variation in programming for the 3D/5 version

The DAN3 key (part 12) is not required for this version,
and in order to program the doses it is sufficient to press
the button with the spiral symbol  for more than 4 sec-
onds. You can then follow the same operations as for the
standard version, which are described in the following.

N.B.

The LEDs stay on for 5 seconds after which, if no button
has been pressed, they turn off; you must then repeat
the above-mentioned procedure to turn them on again
and to prepare the electronic module for programming;

3. press the first button within 5 seconds and press it
again once you have obtained the desired amount of
coffee; at this point, the LEDs will turn off and this but-
ton will remain programmed as for the dose brewed pre-
viously;
4. repeat steps 2, 3 and 4 for the other three buttons;
any time a button has been programmed, by pressing
the button with the spiral again, the LED of the pro-
grammed button(s) will remain switched off.
5. once you have programmed the first 4 buttons of the
first control panel from the left, turn the DAN3 switch
(part 12) off; the dosage programs set according to the
above will be stored in memory and the 5th button (the
one with the spiral) will return to its function as a con-
tinuous brewing on/off button.

N.B.

The programs for the first group from the left will
become the default programs for the remaining groups,
although you may wish to program these groups differ-
ently in which case you need to follow steps 1 to 5 for
the remaining control panels. The leftmost control panel
must be programmed first; indeed, if you were to pro-
gram this last, all its settings would be automatically
transferred to the other groups.
If you decide to change any programs, you will have to
wait for a few minutes. In fact, you will not be able to set
any new program until the LEDs have turned on again,
after having activated the DAN3 switch (part 12) and
pressed the 5th button with the spiral symbol.
Each button also works as a switch and, therefore, you
may stop coffee brewing at any time, whenever you
have obtained the desired quantity, by pressing again
the same button you used to start such action.

Fault warnings

If the wheel does not send any signals to the electronic
module for more than 3-4 seconds, the LED of the but-
ton which has been pressed will start flashing. This
means that:
A) water is not flowing over the wheel and is therefore
not reaching the coffee groups, which may be due to:
1. the ground coffee being too fine meaning that the
coffee gets brewed too slowly (drop by drop or almost
so) and therefore the wheel cannot measure the water
flow within the factory-set time of the electronic module.
2. insufficient water flow past the groups (i.e. onto the
coffee powder) probably due to a combination of one or
more of the following occurrences:
- partial blockage in one of the pipes;
- a malfunctioning motor pump;
- a malfunctioning solenoid valve;
- partial blockage of the filter of the diffuser.
B) there are calcium deposits inside the water flow
counter which prevent the wheel from turning properly.
C) the wheel itself and the header (top part) of the
counter, which contains said wheel in the bottom part,
may be faulty.

10

English

COFFEE BREWING CONTROL PANEL part. 5 fig 2

Содержание FB 70

Страница 1: ...rinks pag 12 6 Maintenance and weekly cleaning operations pag 13 7 De commissioning and demolition pag 14 8 History and use of the La Marzocco coffee machines pag 15 O p e r a t i n g M a n u a l O p...

Страница 2: ...cation is inappropriate and dangerous The manufac turer shall not be held responsible for any damages caused by improper and irrational use 7 Using any electrical device requires that certain fundame...

Страница 3: ...nd 4 groups Legend 1 Main switch 2 Water level sight glass 3 Pressure gauge 4 Coffee groups 5 Coffee brewing control panel 6 Cup warmer switch 7 Hot water switch 8 Emergency button for loading water 9...

Страница 4: ...ps 3 4 litres 1400 Watts 3 groups 5 0 litres 1600 Watts 4 groups 3 4 3 4 litres 1400 1400 Watts 2 boilers installed It consists of a cylindrical tank of varying length accord ing to the number of coff...

Страница 5: ...n the 1 2 3 and 4 group versions and is essentially composed of the same parts as model EE This model differs from model EE in that it allows the ope rator to choose four different quantities of water...

Страница 6: ...E n g l i s h 7 Legend fig 3 3 Installation 380 Volt cable 220 Volt cable Water tubing Water supply tubing Drain tubing MOTOR PUMP WATER PURIFIER...

Страница 7: ...ore connecting the motor pump and the machine in order to eliminate any residual particles which could oth erwise get stuck in taps or valves thus preventing them from working properly N B The pump is...

Страница 8: ...tly maintained at a constant value automatically During this time it may happen that the pointer of the lower scale on the pressure gauge part 3 Fig 1 or 2 reach as high as 14 15 bar this may occur an...

Страница 9: ...ain programmed as for the dose brewed pre viously 4 repeat steps 2 3 and 4 for the other three buttons any time a button has been programmed by pressing the button with the spiral again the LED of the...

Страница 10: ...scale of the pressure gauge part 3 Fig 1 or 2 reach as high as 14 15 bar this may occur any time that while activating the groups the motor pump forces cold water into the coffee boiler at a pressure...

Страница 11: ...t 11 located between the group furthest to the right and the steam nozzle part 9 and pressing the button part 7 Fig 1 or 2 which commands hot water delivery you can then add the bag containing tea cha...

Страница 12: ...ean it up you must first remove it by unscrewing the retainer screw then proceed to hold said filter with a pair of pliers and burn off the wood particles contained in the coffee grounds by using a ga...

Страница 13: ...pipe at the purifier part 17 inlet which is locat ed just downstream of the special tap part 18 which has been closed in advance Proceed to remove the drain well piping part 19 Fig 1 At this point th...

Страница 14: ...for each cup the grinder must guarantee a constant amount from dose to dose It is best to grind coffee from time to time trying not to leave any ground coffee in the grinder overnight and during days...

Страница 15: ...hat by pressing the 1st button you get 1 regular coffee pressing the 2nd one you get one tall coffee pressing the 3rd you get 2 regu lar coffees and by pressing the 4th one you get 2 tall cof fees The...

Страница 16: ...must fill in the following log with the date a short description stamp and signature Whenever the product has not been installed according to the instructions included in the Operating Manual and has...

Страница 17: ...ild kit Check pressure switch Check coffee boiler expansion valve Replace coffee boiler expansion valve MANDATORY MAINTENANCE AND CHECK UP OPERATIONS These operations are in addition to the Maintenanc...

Отзывы: