1
ON
3
2
English
10 EN
Press the backlit main switch to turn on
the machine.
The preset working pressure must be
reached before the machine is ready
for use.
During this phase, the boilers (
only on
“HD / GT” machines
) are loaded and
the heating phase begins.
If one of the
buttons is pressed,
coffee will be served at the temperature
reached at that moment.
All of the other buttons are disabled
because the working pressure has not
been reached.
While waiting for the machine to be
ready for use, insert the
¿
lter holders
in the units.
CHECK BOILER
10. Daily operation
USE
“Before setting the machine to work, make sure that:
• the main electric power switch is on;
• the mains water tap has been turned on".
Содержание M100 Dosatron
Страница 4: ...M100 1 6 11 8 9a 9 20 13 19 19 19 15 23 Cold Touch Turbomilk 9c Tsn 12 35 Tsb 9b II...
Страница 87: ......