![L.B. White CP400AK Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/l-b-white/cp400ak/cp400ak_owners-manual-and-instructions_3144166010.webp)
Figure 7 – Component Identification
Flat Washer
Cotter Pin
Bushing
Wheels
(Solid Type)
Wheel Caps
Hardware Kit
Front Handle
Handle
Frame
Wheel Axle
Wheel Support Frame
Handle Supporter
ASSEMBLY FOR CP650AK
TOOLS REQUIRED
Long nose pliers
ASSEMBLING WHEEL & HANDLE
1. Slide axle through wheel support frame. Install wheel bushings
and wheel on axle.
NOTE: When installing wheels, tube valve should face out from
support frame (Figure 8).
2. Place flat washers and cotter pins on axle ends and bend cotter
pins with long nose pliers to secure.
3. Place wheel cap on flat washers and put wheel cap
in flat washers end.
4. Loosen 4 screws on the front handle in order to
remove handle front.
5. Move the removed handle front to the handle on
the front side as Figure 8, and then tighten 4
screws after matching handle and handle front.
DIMENSIONS & ASSEMBLY (cont.)
CAUTION
Risk of fire or explosion
■
Do not operate heater without support frame fully
assembled to tank.
Figure 8– Wheel and Handle Assembly
4
10
Wheel
Flat Washer
Wheel Cap
Wheel Axle
Bushing
Nut
User Assembly
Screw
MOVE
Wheel Tube Valve