Rigging procedures
Assembly
Procedure
1.
Secure the threaded rods to the main ceiling.
The enclosure assembly should be centered with the tile frame.
The bottom end of the threaded rods should be approximately at 87 mm / 3.4 in of the tile frame.
35
0
m
m
/ 1
3.
8
in
572 mm / 22.5 in
87
m
m
/ 3
.4
in
2.
Remove the placeholder screws from the enclosure.
3.
Secure the rigging brackets to the enclosure using the M6x16 Torx screws.
x4
3 N.m
T30
4.
(p.42).
36
SB10r owner's manual (EN) version 1.1
Содержание SB10r
Страница 1: ...SB10r owner s manual EN...