Rigging procedures
Assembly
Procedure
1.
Cut the drywall ceiling. Refer to the provided template.
Use the cardboard template provided with SB6r-Screen.
min. 599.5 mm / 23.58 in
max. 604.5 mm / 23.78 in
m
in
. 5
99
.5
m
m
/ 2
3.
58
in
m
in
. 6
04
.5
m
m
/ 2
3.
78
in
m
in
. 3
0
m
m
/ 1
.2
in
m
in
. 3
0
m
m
/ 1
.2
in
2.
Pass the frame parts through the drywall cutout.
3.
Assemble the frame.
Make sure the studs are oriented towards the drywall ceiling.
4.
Fix the frame to the drywall:
a) Position the frame in the drywall cutout using the studs.
28
SB10r owner's manual (EN) version 1.1
Содержание SB10r
Страница 1: ...SB10r owner s manual EN...