Rigging procedures
4.
Secure KARAIIi-DOWNK3i on Kara IIi and tighten the screws.
Use four M6x19 rigging screws. Apply a torque of 5 N.m.
5 N.m
This step requires three operators.
Hold the enclosure at the bottom until the rigging plates are secured.
5.
Secure Kara IIi under the array:
a) Lift Kara IIi under the K3i array.
50
K3i owner's manual (EN) version 1.0