K2_RM_EN_3.0
w w w . l - a c o u s t i c s . c o m
1 9 / 76
4.2
Flying
Final check
After the setup, always verify no yellow labels are visible on the front and on both sides of the array.
At least one motor for each K2-BAR
When using two K2-BAR, do not implement a bridle between the bars.
Nobody behind the array when lifting enclosures.
To avoid collisions caused by the swinging motion, do not stand behind the array when lifting the enclosures.
Safe maximum of 12 K2 enclosures in a pullback configuration
Up to 12 K2.
Space between pullback rigging points
The space between the two lifting points used for this configuration must be aligned with the array pickup
points.
The deployment load-bearing lines must be parallel to each other.
Before setup, choose a flying option
Refer to SOUNDVISION modeling and to
3.4 Elements for flying
(p. 13).
To implement a pullback with a K2-BAR :
in
front extension a
ttach the shackle to
hole #1
.
in
rear extension
attach the shackle to
hole #21
.
K2 enclosures under K2-BUMP
Prepare all the blocks of 4 K2 necessary to build the array.
If a block is not already built
, refer to
PROCEDURE A
.
Preset the inter-enclosures angles.
Refer to
PROCEDURE B
.
Place an open a K2-BUMPFLIGHT under the motor.
If necessary
, attach one or two K2-BAR to the K2-BUMP.
Refer to
PROCEDURE G
.
If necessary
, stack one or two LA-RAK on the K2-BUMP.
Refer to
PROCEDURE M
.
Prepare the pickup points.
Refer to SOUNDVISION for the number and position of the shackles.
Lift the assembly so you can position a block of four K2 under it.
Attach the block of four K2
to the K2-BUMP
Refer to
PROCEDURE H
.
Verify that the rear rigging arms are secured by pins and that no yellow
label is visible on the front.
Lift the assembly so you can position a block of four K2 under it.
Verify that no yellow label is visible on both sides of the array.
Attach the block of four K2 enclosures to the bottom of the array.
Refer to
PROCEDURE J
.
Verify that the rigging arms at the back are secured by pins and that no
yellow label is visible on the front.
Repeat the two previous steps until the array is complete.
If necessary
, implement a pullback with K2-RIGBAR.
Refer to
PROCEDURE N
.
Raise the array to its final trim height.
Adjust site and azimuth angles.