18
In-Fit Exercise Pools
in.yt-12 connections (Export only)
230V Single-phase 230V Dual-phase*
(1x32A)
(2x16A)
Connect jumpers
Connect jumpers
(brown wires)
(brown wires)
P7 ---> P13
P7 ---> P10
P10 ---> P74
P13 ---> P74
230V Three-phase* 230V Three-Phase*
(3x16A)
Delta
Connect jumpers
Connect jumpers
(brown wires)
(brown wires)
P7 ---> P10
P7 ---> P10
P11 --->P13
P13 ---> P74
* For Dual and Three-phase connections, make sure to change the proper phase setting in the
Electrical Configuration section of the control panel.
6. Secure the wire connections. Push the wires into the equipment control pack.
7. Close the cover on the equipment control and tighten the screws.
8. Electrical hook up is now complete. Do not re-attach the front cabinet panel yet.
For Dual and Three phase connections:
Change to proper phase setting in the control
panel. For In-Fit 13 SL, press and hold the Program Key until
b32
is shown on the display.
Change to the proper breaker and phase settings. For all others, see Operation Instruc-
tions on how to enter the Electrical Configuration section. When prompted, press and hold
the key next to “confirm” to enter the menu where electrical setting can be changed.