12
y
Now press the power button on the panel repeatedly,
and thed oil flows out.
Lock the valve and press the power button again,
and the boiler gets ignited.
y
In case that after removing air completely, the igni-
tion has failed repeatedly about three times, contact
the sales agency or the commercial agency.
y
Open the drain valve, and check out whether there
is water in.
y
Check out whether the pipes is filled with water.
y
Check out that the boiler is grounded to earth.
(Don’t ground to the gas pipe or a lightening con-
ductor)
y
Plug the power plug in the outlet.(Checking if the
outlet power is 220V)
y
Press the power button, and check out if
“RUN” lamp turns on a little later.
Preparation and checking befor
starting to operate
Air vent valve
Содержание KDB-200NHC
Страница 21: ...21 MODEL NO KDB 200NHC 250NHC 350NHC 10 Electric wiring diagram ...
Страница 22: ...22 ...
Страница 23: ...23 MEMO ...
Страница 24: ...24 MEMO ...